Orange County NC Website
Docusign Envelope ID: 048C1438-0009-83DO-8069-7787E9608DD9 <br /> ORANGECOUNTY <br /> CHANGE ORDER REQUEST <br /> NORTH CAROLINA <br /> Date : April 8, 2026 Project: Piedmont Food Processing Center HVAC Replacement Change Order No. 01 Department: Asset <br /> Management Services Department Address : 306 Revere Road, Hillsborough NC 27278 Project : Piedmont Food Processing Center HVAC Replacement <br /> Contractor: Brady Service, Inc. Contractor Address : 2025 16th Street, Greensboro, NC 27405 Effective date of original contract : March 19, <br /> 2025 <br /> This change order ❑ increases ❑ decreases the contract time by days . Check here if no impact to contract time ® . <br /> Will this change order impact the date of substantial completion ? ❑ Yes ® No . If yes, the amended date of substantial completion is : <br /> Full Description of Change : Piedmont Food Processing Center, provide and install two PC controllers for the existing Accurex Kitchen Hood systems . This <br /> includes ( 1 ) EMS2 ( EF1, DOAS2 ) 1 Accurex Kitchen Controls, Constant Volume/VFD for Exhaust Fan, and ( 1) EMS1 ( EF1 DOAS1) 1 Accurex Kitchen <br /> Controls, Constant Volume/VFD for Exhaust Fan . Provide and install new shunt trip breaker for dry kitchen to shut off electrical power when hood is <br /> activated . <br /> Reason for Change : The existing Accurex Kitchen hood system controllers do not support the new HVAC equipment. The controllers are required to shut <br /> down the heating, ventilation and cooling system when activated, the existing controllers do not perform this function . The manufacturer provided <br /> recommendations for wiring the existing controllers to perform this function, however, this did not work. The manufacturer performed another site visit <br /> and determined that new controllers would be required . The existing shunt trip breaker has failed and is not allowing the power to shutdown to the <br /> existing kitchen equipment when the hood system is activated, therefore this breaker must be replaced to pass the final inspections . <br /> Original contract sum : $ 375, 000. 00 <br /> Contract sum prior to this change order: $ 375, 000. 00 <br /> Amount of this change order: $ 37,055 . 00 <br /> Total sum of the contract including this change order : $ 412, 055 , 00 <br /> This change order is executed to amend the contract time or contract sum . It shall not be construed to impact the original contract, project, services, or <br /> work in any other manner. All other terms of the Original Contract remain in effect. <br /> Approved and executed this 8th day of April , 2026. <br /> 4/11/2026 <br /> C*inl F�lhrset� 4/9/2026 1i'w,s M <br /> Contractor Owner Architect (when retained ) <br /> By : Asst. Corporate Secretary By: County Manager By. <br /> Revised 01/24 <br />