Orange County NC Website
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: December 7, 2020 <br /> Action Agenda <br /> Item No. 8-i <br /> SUBJECT: Request for Road Additions to the State Maintained Secondary Road System for <br /> River Stone Road and Running Cedar Lane in the Cabe Crossing Subdivision <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Maps Tom Ten Eyck, 919-245-2567 <br /> 2. Subdivision Final Plat Tom Altieri, 919-245-2579 <br /> 3. NCDOT Petition Information Craig Benedict, 919-245-2592 <br /> PURPOSE: To make a recommendation to the North Carolina Department of Transportation <br /> (NCDOT), and the North Carolina Board of Transportation (NC BOT), concerning a petition to add <br /> River Stone Road and Running Cedar Lane in the Cabe Crossing Subdivision to the State <br /> Maintained Secondary Road System. <br /> BACKGROUND: This request includes a petition for two (2) road additions to the State <br /> Maintained Secondary Road System. The road length and width are as follows: <br /> Road Name Length in Miles Number of Frontage Pavement/Right-of- <br /> Lots with Houses way Widths in Feet <br /> River Stone Road 0.51 12 20/50 <br /> Running Cedar Lane 0.14 7 18/50 <br /> Total 0.65 19 N/A <br /> The Cabe Crossing Subdivision is located in an Agricultural Residential (AR) zone, west of <br /> Pleasant Green Road and south of Cabe Ford Road (Attachment 1). The single-family residential <br /> subdivision is located within Orange County's planning jurisdiction and was developed and <br /> approved subject to the County's zoning and subdivision regulations. There is no known <br /> subdivision violation associated with the Cabe Crossing Subdivision. <br /> The Cabe Crossing Subdivision was recorded on October 31, 2014 (Book 113/Page 145) <br /> (Attachment 2). River Stone Road and Running Cedar Lane were designed to public road <br /> standards but have been private roads in the interim; they were intended to become public roads <br /> when conditions met NCDOT maintenance responsibility and ownership criteria. <br /> River Stone Road has a length of 0.51 miles and provides access for twelve fully developed lots. <br /> The road has a right-of-way width of 50 feet, and a pavement width of 20 feet. The road serves <br /> as the singular access road for vehicular ingress/egress at its intersection with Cabe Ford Road <br /> (State Road 1570), and it connects with Running Cedar Lane before terminating at the southwest <br /> end of the subdivision with a cul-de-sac. <br />