Orange County NC Website
.7t <br /> CORRECTED VERSION • <br /> 'Note: Meeting Date <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> Action Agenda <br /> Item No. <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: JANUARY 30, 1989 <br /> • <br /> SUBJECT: SITE SELECTION FOR UPPER ENO RIVER BASIN RAW WATER RESERVOIR <br /> DEPARTMENT: MANAGER PUBLIC HEARING YES: X NO: <br /> ATTACHMENT(S): INFORMATION CONTACT: MANAGER'S OFFICE <br /> X501 <br /> TELEPHONE NUMBER- <br /> Hillsborough - 732--8181 <br /> Chapel Hill - 968-4501 <br /> Mebane - 227-2031 <br /> Durham - 688-7331 <br /> PURPOSE: To receive Public comment with regard to .selecting a site for a <br /> raw water reservoir in Northern Orange County. <br /> BACKGROUND: In 1987 , a two phase water supply study was begun on behalf of <br /> Orange County by Hazen and Sawyer, P.C. , Consulting Engineers. <br /> The Purpose of the Phase I portion of the study was to identify <br /> potential reservoir sites in Northern Orange County which could <br /> be developed to help meet the long term water supply needs of the <br /> County. <br /> An al ternative �o reservoir construction, development of <br /> raw water pumping capacity from Jordan Lake, was- also e valuated <br /> • <br /> for feasibility. <br /> The Phase I Study located four potential reservoir sites, within <br /> the Upper Eno River Basin. These sites were identified as site A, <br /> • where Corporation Lake could be expanded ; Site B, on the Eno <br /> River just upstream of. its confluence with McGowan Creek; Site C, <br /> on the Eno River upstream of the Halls Mill Road crossing ; and <br /> Site D, on Seven Mile Creek southwest of Interstate 85 . A <br /> preliminary design for a dam and reservoir was: done for each of <br /> the four sites. The raw water yield, construction cost, <br /> innundated area and impact on existing roads and structures was <br /> determined for each site <br /> 4 <br /> Public input to the Phase I Study was provided by an ad hoc <br /> • <br /> citizen committee, the Reservoir Site Committee, appointed by• the <br /> • County Commissioners . The Reservoir. Site Committee recommended tc <br /> the County Commissioners that the land acquisition process be <br /> undertaken to acquire property at Site B on the Eno above McGowar <br /> Creek, and at Site D, Seven Mile Creek, for the purpose of <br /> reservoir construction, future reservoir construction and <br /> wildlife mitigation. <br />