Orange County NC Website
z - -4T . <br /> RESOLUTION <br /> OF <br /> THE ORANGE COUNTY BOARD OF COMMISSIONERS <br /> Date February 16, 1999 <br /> Name of Subdivision High Point Woods, Phase III <br /> Owner/Applicant Monarch Consulting Trust <br /> Scott Hines <br /> The Board of County Commissioners hereby approves High Point Woods, Phase III Subdivision <br /> preliminary plat dated September 27, 1998, and subject to fulfillment of requirements specified <br /> herein. <br /> Sparrow Hawk Crest Road, its south extension, and its east extension(Wood Thrush Lane)-shall <br /> be maintained by the owner/applicant (Monarch Consulting Trust) and homeowners of High <br /> Point Woods, Phase III, until such time as they are accepted for maintenance by NCDOT or <br /> some other governmental body. <br /> Before the Final Plat of High Point Woods, Phase III, can be recorded: <br /> A. Sewage Disposal <br /> 1. All lots shall contain adequate septic disposal and repair areas, approved by the <br /> Orange County Division of Environmental Health. <br /> 2. Disclosure that the septic system location may restrict the size and location of <br /> improvements shall be included in a document describing development <br /> restrictions to be recorded concurrently with the Final Plat. The document <br /> disclosing that information on the tentative location of septic systems is available <br /> from the Division of Environmental Health. <br /> B. Roads and Access <br /> 1. Sparrow Hawk Crest shall be constructed to Class B private road standards within <br /> a 50-foot right-of-way. Wood Thrush Lane shall be constructed to Class B private <br /> road standards within a 50-foot right-of-way, and Wood Thrush Crest Extension <br /> shall be constructed to Class C private road standards within a 50-foot right-of- <br /> way. Construction shall be inspected and approved by the Orange County Erosion <br /> Control Division. <br /> OR <br /> A letter of credit or escrow agreement or other security shall be submitted to <br /> secure construction of Sparrow Hawk Crest Road and its east and south <br /> extensions to Orange County standards. An estimate of the construction cost must <br />