Browse
Search
2026-149-E-AMS-Pisgah Energy-Pisgah Energy
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-149-E-AMS-Pisgah Energy-Pisgah Energy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 2:06:27 PM
Creation date
5/13/2026 1:35:21 PM
Metadata
Fields
Template:
Contract
Date
4/16/2026
Contract Starting Date
4/16/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$140,296.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 <br /> <br />NORTH CAROLINA <br />CONTRACT AMENDMENT <br />ORANGE COUNTY <br /> <br /> <br />THIS CONTRACT AMENDMENT (“Amendment”) is made and entered into this 16th day of April, 2026, by and <br />between ORANGE COUNTY (hereinafter referred to as “County”) and Pisgah Energy, Inc. (hereinafter referred to as <br />“Provider”). <br /> <br /> <br />WITNESSETH: <br /> <br />THAT WHEREAS, the County and Provider entered into a contract dated July 28, 2025, (hereinafter the “Original <br />Agreement”), for the provision of services for Solar Feasibility Study; and <br /> <br />WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and <br />conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. <br /> <br />NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to <br />amend the Original Agreement as follows: <br /> <br />1. In order to ensure the completion of the Services identified in the term of the Original Agreement is amended <br />to reflect an end date by which all Services shall be completed of June 30, 2027. <br /> <br />2. Exhibit A to the Original Agreement is amended by adding the following tasks and services to the Services to <br />be provided by the Consultant: Town of Hillsborough: Remove ground-mounted solar studies and add roof- <br />top solar studies for four total buildings. Provide design development plans sets to accompany and request for <br />proposal and bid package per proposal dated April 10, 2026, for the Solid Waste Administration Building, <br />Whitted Human Services Center, Sportsplex Field House, and Emergency Services Center. <br /> <br />3. Article 5, Section “a” is amended to reflect a maximum payable not-to-exceed amount of Three-Hundred <br />Thirty Thousand, Three Hundred Fifty-Nine Dollars ($330,359.00). <br /> <br />4. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent <br />it is not inconsistent with this Amendment. In the event there is a conflict between the terms of the Original <br />Agreement and the terms of this Amendment, this Amendment shall control. <br /> <br /> <br /> IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above <br />written. <br /> <br />ORANGE COUNTY PROVIDER <br /> <br />______________________________ __________________________________ <br />Travis Myren Evan Beck, President <br />County Manager <br /> <br /> <br />Docusign Envelope ID: FCAC7529-AAA8-820F-81E7-BD4A77FCF5D3 <br />4/23/20264/30/2026
The URL can be used to link to this page
Your browser does not support the video tag.