Browse
Search
2026-035-E-AMS-Brady Trane Service-Mural Courtroom - Remove existing unit from attic space once new unit is operation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-035-E-AMS-Brady Trane Service-Mural Courtroom - Remove existing unit from attic space once new unit is operation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 2:07:11 PM
Creation date
1/29/2026 2:07:06 PM
Metadata
Fields
Template:
Contract
Date
1/20/2026
Contract Starting Date
1/20/2026
Contract Ending Date
1/28/2026
Contract Document Type
Contract
Amount
$7,222.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br />NORTH CAROLINA <br /> <br />______________________________________________________________________________________________________________ <br />Date: 01/15/2026 Project: Justice Facility Mural Courtroom HVAC Replacement Change Order No. 01 Department: AMS <br /> Department Address: 306 Revere Road, Hillsborough NC 27278 Project: Justice Facility Mural Courtroom HVAC Replacement, 106 E. Margaret <br />Lane, Hillsborough NC 27278 Contractor: Brady Trane Service, Inc. Contractor Address: 2025 16th Street, Greensboro, NC 27405 <br /> Effective date of original contract: 10/8/2025 <br /> <br />This change order increases decreases the contract time by days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial completion is: <br />_______________________________________________________________________________________________________________ <br /> <br />Full Description of Change: Deconstruct and remove the existing water source heat pump from the attic space. <br /> <br />Reason for Change: This work was not originally shown on the plans due to the location and concerns with removing the old unit from the attic. Since <br />the award we have created a plan that would allow the equipment to be removed and would open the attic space for more access to existing equipment <br />that is remaining within the attic. The current access is to crawl under ductwork to get to the remaining equipment, so this would allow a safer option <br />for access. <br />_______________________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 296,500.00 <br /> <br />Contract sum prior to this change order: $ 296,500.00 <br /> <br />Amount of this change order: $ 7,222.00 <br /> <br />Total sum of the contract including this change order: $ 303,722.00 <br /> <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, project, services, or <br />work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 1st day of Februaru, 2026. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br /> <br />By:____________________________ By:___________________________ By:___________________________ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 942DB10A-9327-4FB5-80C8-754554DDC3DF <br />Asst. Corporate Secretary <br />1/20/2026 1/29/2026 <br />County Manager
The URL can be used to link to this page
Your browser does not support the video tag.