Browse
Search
Agenda 09-16-2025; 8-d - Authorization for Use of Construction Manager at Risk Services for the Sheriff’s Office Evidence Storage Facility and Link Government Services Center Renovations
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 09-16-2025 Business Meeting
>
Agenda 09-16-2025; 8-d - Authorization for Use of Construction Manager at Risk Services for the Sheriff’s Office Evidence Storage Facility and Link Government Services Center Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2025 3:05:27 PM
Creation date
9/12/2025 3:06:28 PM
Metadata
Fields
Template:
BOCC
Date
9/16/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-d
Document Relationships
Agenda for September 16, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 09-16-2025 Business Meeting
ORD-2025-028-Article II State of Emergency
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
ORD-2025-029-Article III Noise
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
RES-2025-045-Amendments to the Emergency Management Ordinance – Second Consideration
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-046-Amendments to the Noise Ordinance – Second Consideration
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: September 16, 2025 <br /> Action Agenda <br /> Item No. 8-d <br /> SUBJECT: Authorization for Use of Construction Manager at Risk Services for the Orange <br /> County Sheriff's Office Evidence Storage Facility and John M. Link, Jr. <br /> Government Services Center Renovations <br /> DEPARTMENT: Asset Management Services <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Connor Wilkins, Asset Management <br /> Services Assistant Director, 919- <br /> 245-2689 <br /> Alan Dorman, Asset Management <br /> Services Director, 919-245-2627 <br /> PURPOSE: To authorize the use of the Construction Manager at Risk (CMAR) project delivery <br /> method for the Orange County Sheriff's Office Evidence Storage Facility and John M. Link, Jr. <br /> Government Services Center Renovation project. <br /> BACKGROUND: The Orange County Sheriff's Office Evidence Storage Facility and John M. <br /> Link, Jr. Government Services Center Renovation Link Center Renovation project is a key phase <br /> of Orange County's Justice Center Space Needs initiative. The project includes the construction <br /> of a 6,000 square-foot Evidence Storage Facility adjacent to the Orange County Detention Center <br /> on US Highway 70 in Hillsborough to address long-standing capacity, security, and environmental <br /> control deficiencies. The Link Center, built in downtown Hillsborough in 1992 and vacant since <br /> 2019 due to severe water intrusion and mold, will be renovated to serve as the new headquarters <br /> for the Orange County Sheriff's Office, providing modern, secure, and efficient space while freeing <br /> Justice Center capacity for future expansion. On July 3, 2025, the request for qualifications (RFQ) <br /> was posted for the preliminary and schematic-level design services for developing the Evidence <br /> Storage Facility and renovating the Link Center. <br /> In order to move the construction of the Evidence Storage Facility and renovation of the Link <br /> Center project forward, the Board needs to authorize the use of a project delivery method. For <br /> large-scale construction projects, the four main processes are: <br /> a) Design Bid Build with Separate Prime Bidding <br /> b) Design Bid Build with Single Prime Bidding <br /> c) Construction Management at Risk (CMAR) <br /> d) Design Build <br /> Staff recommends the use of a Construction Manager at Risk. Under this method of contracting, <br /> the owner contracts directly with the designer and the CMAR, all of whom are selected based on <br />
The URL can be used to link to this page
Your browser does not support the video tag.