Browse
Search
Agenda - 12-11-2008 - 6d late
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-11-2008
>
Agenda - 12-11-2008 - 6d late
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2008 3:37:39 PM
Creation date
12/10/2008 3:37:37 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d late
Document Relationships
Minutes - 20081211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
ORD-2008-114 - Educational Facilities Impact Fee Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 5 !g <br />Adopted Student Generation Rates and Results of 2007 Study and Relationship <br />to SAPFO (Schools Adequate Public Facilities Ordinance) <br />Student generation rates have increased in both school districts from the rates <br />calculated in 2001. The Adopted (2001) student generation rates are as follows: <br />Ado fed Student Generation Rates 2001 <br />C ha el Hil l-Carrbo ro Scho ols Ora n a Cou nt Sch oois <br /> Elem. Middle High Alf ~ Elem. Middle High All <br /> Grades Grades <br />Single- 0.168 0.095 0.123 0.386 0.150 0.075 0.084 0.309 <br />Famil <br />Other 0.094 0.042 0.043 0.179 0.084 0.033 0.030 0.147 <br />AI! <br />Housing 0.134 0.070 0.086 0.290 0.140 0.068 0.076 0.284 <br />T es <br />The analysis for the 2007 draft report found the student generation rates in the <br />following table. Some data was aggregated slightly differently for the school districts <br />since the housing types found in each distric# vary. {i.e., Single Family Attached / <br />Multifamily was combined for OCS since there is minimal single family attached <br />housing in the OCS district}. <br />2007 Stud Student Gener ation Rates <br />Cha I Hill-C arrboro Schools Ora n a Cou n Sch ools <br /> Elem. Middle High All Elem. Middle High Ail <br /> Grades Grades <br />Single-Family 0 263 0.143 0.197 0.603 0.168 0.090 0.126 0.384 <br />Detached <br />Single-Family 158 <br />0 0.077 0.115 0.350 - - - - <br />Attached . <br />Multifamil OA38 0.015 0.017 0.070 - - - - <br />Single-Family <br />Attached / - - - - 0.066 0.022 0.034 0.122 <br />Multifamil ' <br />Manufactured 0141 0.066 0.061 0.268 0.096 0.041 0.049 0.186 <br />Homes <br />All Housing 0.149 0.078 0.105 0.332 0.145 0.074 0.102 0.321 <br />T es <br />The contract with TischlerBise, Inc. included an update to student generation rates <br />because student generation rates are a factor, along with school construction costs, <br />in the Maximum Supportable Impact Fee calculation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.