Browse
Search
Agenda - 12/11/2008 - 4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-11-2008
>
Agenda - 12/11/2008 - 4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2008 3:19:08 PM
Creation date
12/9/2008 3:19:06 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4n
Document Relationships
2008-116 Purchasing - Motorola Service Agreement for 9-1-1 Radio Equipment
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mt~Tt~RC?L~ <br />3.2.2. Repair Verification preference and procedure. <br />3.2.3. Database and escalation procedure forms. <br />3.2.4. Submit changes in any information supplied in the Customer Support Plan to the Customer <br />Support Manager. <br />3.3. Provide the following information when initiating a service request: <br />3.3.1. Assigned System ID number. <br />3.3.2. Problem description and site location. <br />3.3.3. Other pertinent information requested by Motorola to open a Case. <br />3.4. Allow Servicers access to Equipment. <br />3.5. Supply Infrastructure or FRU, as applicable, in order for Motorola to Restore the System as set forth in <br />paragraph 2.5.2. <br />3.6. Maintain and store in an easily accessible location any and all Software needed to Restore the System. <br />3.7. Maintain and store in an easily accessible location proper System backups. <br />3.8. For E911 systems, test the secondary/backup PSAP connection to be prepared in the event of a <br />catastrophic failure of a system. Train appropriate personnel on the procedures to perform the function of <br />switching to the backup PSAP. <br />3.9. Verify with the SSC that Restoration is complete or System is functional, if required by Repair <br />Verification preference provided by Customer in accordance with section 3.2. <br />3.10. Cooperate with Motorola and perform all acts that are reasonable or necessary to enable Motorola to <br />provide these services. <br />OnSite Infrastructure Response and Dispatch Service <br />Approved by Motorola Contracts and Co»rptiance 1/30/08 page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.