Browse
Search
Agenda - 12-11-2008 - 3a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-11-2008
>
Agenda - 12-11-2008 - 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:59:22 AM
Creation date
12/9/2008 2:52:44 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3a
Document Relationships
Minutes - 20081211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 <br />A and Meter Point B with a design accuracy of not less than two percent (2%) for all parameters <br />measured and taking into account verification methodologies for Environmental Benefits. <br />135. Such Gas Flow Meters shall be owned, operated, maintained and calibrated by the <br />University at its sole cost and expense. The Gas Flow Meters shall be designed and operated to <br />provide time-synchronized data for MMBtu and to provide all other information required to be <br />measured pursuant to this Agreement. The University's Gas Flp:iVleters shall be sealed, with <br />f,.` ra*E <br />.f~3' <br />the seals broken only for the purpose of inspecting, testtt~g, repay ~ or recalibrating the <br />metering devices. The University shall keep its Gas Flow Meters accurate` '~~:m good working <br />~. ,, . <br />order and the University shall periodically test such metering equipment as the Uni varsity deems <br />~' <br />necessary; provided that the University shall test its metering equipment at least once every six <br />(6) months, but in no case less than any'testin~.,,r quirement set forth in any applicable Laws or <br />~ ~ ~~ ~., <br />manufacturers' recommendations. In the ~ev~ent a ~~ ~ ~lqw Meters is to be tested, cleaned, <br />r ~'w ~ <br />~~ j_ `4C <br />re aired or recalibrated, or otherwise read or rv', pected by University, the University shall <br />p ,~. <br />provide the County with five (5) days prior wrier notice of any such procedure, so that the <br />~~~~`'_ <br />County may be„pzesent during any such procedure: The University shall preserve all charts, test <br />data and~ys'Ymilar recor <br />-~ F <br />~,t- <br />this Agr~`"m~nt. The <br />~~~~, <br />Meters. ~ __~~ ~~~- <br />;:_ <br />136. The ~' ~dC) <br />times during the Terns <br />with the record retention provisions of Paragraph 149 of <br />shall have the right to install and maintain its own Gas Flow <br />its agents shall have the right from time to time, at reasonable <br />to monitor, access, and inspect the condition and use df the LFG Project <br />and to monitor, access, and inspect work in progress and the day-to-day operation of the LFG <br />Project. Any such monitoring, examinations, inspections or visits shall be conducted in a <br />manner so as to cause minimum interference with the University's LFG Project. <br />43 <br />{00018638.DOC 16} <br />
The URL can be used to link to this page
Your browser does not support the video tag.