Browse
Search
Agenda - 12-11-2008 - 3a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-11-2008
>
Agenda - 12-11-2008 - 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 11:59:22 AM
Creation date
12/9/2008 2:52:44 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3a
Document Relationships
Minutes - 20081211
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br />Landfill Gas necessary to operate the Landfill in accordance with the Landfill Permits and all <br />applicable Laws. <br />56. The University agrees to flare any Landfill Gas delivered to the Delivery Point <br />that is not transported by the University to the Gas Conversion System as follows: (i) during the <br />period occurring after the Flare Start-up Date and before the Engine Start-up Date; (ii) in the <br />event that LFG generated by the Landfill exceeds the capacity of the Gas Conversion System, as <br />determined by the University in accordance with good engineering practices and industry <br />standards; (iii) during Gas Conversion System mai <br />as reasonabl necess to rotect human health;~`'s`at":-';~ or <br />y ~Y P ~., nw w~ <br />and (v) during the <br />v~~~ <br />pendency of a force majeure event affecting the Gas Con r~~an <br />n ~~ <br />~~ <br />aces portions <br />~at~~ <br />~~ <br />e d~elopment, <br />~..., <br />operation of the LFG Project, including any ac't;j~" 'es necessary to evaluate the feasibility of the <br />~~ <br />LFG Project, or the design and permitting of th;~LFG Project. The County agrees to make <br />~~F;: <br />commercially ,reasonable efforts to assist the Umversrty, whenever feasible, _in accessing any <br />~. <br />57. The University shall have ~ cnxght to use and <br />,~,. <br />~~, -~~ s 3 <br />such other property depicted on Exhibit C~ to c ~y` <br />~.~. ~Y~:=O wt ~G ~ <br />of the Landfill and <br />parcel o~~property notro~ed solely by the County that is necessary for the construction and <br />~~E~~, y~~rr <br />~S y. ~i ~ ~'i..*. <br />operatio~~~';,the LFG Pro~e~tncluding the Greene Tract. <br />~, ~, x <br />~L ~_ <br />58. County ~~ grant the University, without additional University payment <br />'~ ~ ~_ t <br />L" <br />-~t~~ <br />°' ~ ;~''~ this A eemen such easements and ri is of way through <br />beyond the compensa~~~~et forth na gr t, ~ <br />~,. ~ <br />~, <br />the Landfill site and ~ jer property owned solely by the County as may be necessary to drill gas <br />extraction wells, lay pipelines, lateral lines, header lines, and any other part of the LFG Project <br />infrastructure as contemplated by this Agreement, including, without limitation, the easements <br />and rights of away set forth on Exhibit C. The County also grants the University, without <br />13 <br />ir, or associated downtime; (iv) <br />System. <br />construction, and <br />{00018638.DOC 16} <br />
The URL can be used to link to this page
Your browser does not support the video tag.