Orange County NC Website
conveyors, etc., additional equipment adds to the number ofseparate process and <br />associated equipment necessary for operation. The Tel Aviv installation of Arrow has <br />thus far experienced many shut-downs due to the presence of troublesome <br />components in the input waste stream. To combat this, a higher level of pre- <br />processing is being implemented so that future applications can operate more <br />Figure B-14.ArrownBilo Facility in Haifa <br />G8B/C08027-01 B-21 August 15,2O08 <br />