Orange County NC Website
was addressed with Chuck Edwards who did not feel it was a concern with the number of lots proposed. He <br />may encourage construction traffic to do a weighting which means any construction traffic would be <br />with lesser weight so it would not be downgraded.' '. Another concern about traffic was the road does dead <br />end and there was no turn around. There was a concern about not allowing traffic not being allowed to turn <br />around. We felt it would we should install a sign, This is a dead end road please do not enter". Other <br />concerns were water, which was duly addressed, the ongoing management of the project. We elected to do <br />all the construction at once and not phase it out. The integrity of the setbacks are not shown on here but the <br />lots being the size they are, we were able to encourage the building the lot itself. That makes for the <br />ability to have significant setbacks. Originally we were proposing a signification component of open space <br />on the left end trying to encourage the continuity with the Eno River Association and have less open space <br />around the perimeter. In lieu of that plan, we increased the perimeter of open space and increased the <br />setback area and recognized secondary setbacks. We also incorporated many green policies in the <br />homeowner's declaration which are available. We are trying to encourage the green spaces in 'all the <br />communities. <br />Larry Wright: My question-deals with odors, how you will protect the homeowner from dealing with an irate <br />neighbor over the smell of manure pile that has been there for 30 years? <br />Jeff Peloquin: I believe there is a standard in the policies that existing properties are recognized. If you <br />want to have that incorporated in the homeowner's association, which would be fine. <br />Craufurd Goodwin: This seems to deserve a formal, written response. We have a responsibility to be <br />concerned for the welfare of the neighbors. <br />Jeff Peloquin: For the most part it is via the homeowner's association declaration including the landscape <br />plan. <br />Craufurd Goodwin: Then they could be answered quickly, (i.e., see page 46). <br />Jay Bryan: We could make that part of the conditions. <br />Jeff Peloquin: Everything that is of legal statue and concern and even not, has been and is being <br />addressed. <br />Jay Bryan: Are there any individuals from the public that would like to speak. <br />Melinda Ruley: I will be the only speaker on this subject tonight. I speak on behalf of my family and the <br />neighbors. You have the ability to make any his you wish. We are grateful to the Planning <br />Board for reducing the number of lots in this subdivision. It is still larger than we would like. You have the <br />set of detailed requests we spent a lot of time on. They fail into two general categories, construction traffic <br />and creating a development that is in character with the existing rural community. We did not get the large <br />lot we hoped for and we have been told that this will be sold to tract developer once it is approved. We have <br />asked the applicant to look at the details you have. in this part of Orange County we are just barley holding <br />on to our rural designation so of course, we object to the threat of more traffic, houses and lights. We are <br />asking you help to see that this subdivision does not become one more suburban development of the kind <br />that is eroding the rural character. We ask that you recommend that our requests be satisfied. I have been <br />puzzled over the stub out. I have to conclude that stubs outs are a dodge for the developer who reports to <br />solve problems but are putting them onto the next property owner to solve his problems for him. Would it be <br />better to require the applicant to design a subdivision that fits the space he has? I would ask that you <br />recommend that stub outs be removed from this development. Thank you for your time and consideration. <br />