Browse
Search
Agenda - 12-01-2008 - 3c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-01-2008
>
Agenda - 12-01-2008 - 3c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2008 12:47:29 PM
Creation date
12/1/2008 12:43:58 PM
Metadata
Fields
Template:
BOCC
Date
12/1/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3c
Document Relationships
Minutes - 20081201
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66 <br />A and Meter Point B with a design accuracy of not less than two .percent (2%) for all parameters <br />measured and taking into account verification methodologies for Environmental Benefits. <br />135. Such Gas Flow Meters shall be owned, operated, maintained and calibrated by the <br />University at its sole cost and expense. The Gas Flow Meters shall be designed and operated to <br />provide time-synchronized data for M1V1Btu anal to provide all other~~rmation required to be <br />:mot:. <br />measured pursuant to this Agreement. The University's Gas F1Q1Vleters shall be sealed, with <br />~~ ~. <br />,~~~~ <br />the seals broken only for the purpose of inspecting, testg, rep" ~'T, _~ or recalibrating the <br />k~;. <br />metering devices. The University shall keep its Gas Flow Meters accurate''- ~.;,,~n good working <br />:,~_ ~, <br />order and the University shall periodically test such metering equipment as the IrY ~~rsity deems <br />necessary; provided that the University shall test its metering equipment at least once every six <br />(6) months, but in no case less than any <br />manufacturers' recommendations. In the <br />repaired or recalibrated, or otherwise read or <br />provide the County with five (5) days prior <br />County may be,~presen <br />L <br />data and~im~lar reco <br />,, ~.w as i}'~,... <br />this "~A~grirei_m nt. The <br />Meters. °~~ <br />136. The <br />times during the Terns <br />set forth in any applicable Laws or <br />Meters is to be tested, cleaned, <br />byhe University, the University shall <br />of any such procedure, so that the <br />during any such procedure~''~ The University shall preserve all charts, test <br />with the record retention provisions of Paragraph 149 of <br />shall have the right to install and maintain its own Gas Flow <br />its agents shall have the right from time to time, at reasonable <br />to monitor, access, and inspect the condition and use bf the LFG Project <br />and to monitor, access, and inspect work in progress and the day-to-day operation of the LFG <br />Project. Any such monitoring, examinations, inspections or visits shall be conducted in a <br />manner so as to cause minimum interference with the University's LFG Project. <br />43 <br />{00018638.DOC 16} <br />
The URL can be used to link to this page
Your browser does not support the video tag.