Orange County NC Website
55 <br />B. Payments to the County <br />113. The University shall make payments to the County based on the heating energy <br />content of all Gas Sold. Such payments shall consist of the Flare Payment and the Conversion <br />Payment, as calculated in accordance with Subparts C and D of this Article VII. Such payments <br />and any other payments that the University may be required to make under this Article shall be <br />~.~~ <br />fiall compensation to the County both for the heating energy c~o~t,nt of the LFG and for any <br />Environmental Benefits resulting from the destruction of <br />associated with reducing greenhouse gas emissions <br />114. The University will make <br />heating energy content of the LFG delivered to the U <br />A.. <br />e LFGr~cluding those benefits <br />~ ~:*a~~- <br />~. ~ .... <br />a'.~ <br />g renewable`'` e~gy. <br />~~.; <br />~~~:~~~au^3. <br />7,~:_n~_ <br />~A <br />eats to the Coul%i.~y ~a~sed on the <br />,. ~:~. <br />~~., <br />in the preceding calendar month, <br />as determined in accordance with Subparts C and D of this Arti°~~~~~~II.~ <br />C. Payment for Gas Flared ~ ' <br />115. Each mon . ~ "~i°ng the Term of this Agreement, the University shall make <br />4 ~~--~~ <br />payments to the Co ~:. " ~ based on `;t~e heating energy content of the LFG that is delivered to the <br />LFG flare (the "Flare Pa~~'. ';},,~~a}~rnmenc,,~~,~upon the Flare Payment Date (as that term is <br />~. <br />~- ~'''.. <br />defined in Article VIII hereunder.} d continuing to the Conversion Payment Date (as that term <br />~uF . <br />fitYY~ <br />is defined in Article VIII hereunder);""~Td (b) for any period after the Conversion Payment Date <br />during which the University operates the flare. <br />116. The University shall continuously monitor the LFG at Meter Points A and B, and <br />such LFG will be measured, recorded, and totalized on an hourly, daily and monthly basis. The <br />heating energy content of the LFG delivered to the flare shall be based on its measured monthly <br />methane content at Meter Point B. The methane cantent shall be measured in scflmonth and shall <br />be equal to the product of (a) the percent methane by volume, and (b) the LFG measured in <br />scf/month at Meter Point B (the "Meter Point B Methane Content"}. For purposes of <br />32 <br />{00018638.DOC 16} <br />