Browse
Search
Agenda - 12-01-2008 - 3c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-01-2008
>
Agenda - 12-01-2008 - 3c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2008 12:47:29 PM
Creation date
12/1/2008 12:43:58 PM
Metadata
Fields
Template:
BOCC
Date
12/1/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3c
Document Relationships
Minutes - 20081201
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br />specifications. Any plans and specifications for which the County has not provided a response <br />within fifteen (15) calendar days shall be deemed approved. Should the County provide <br />comments on the initial submission of any submitted plans and specifications, it shall then have <br />fifteen (15) calendar days to complete the final review and approval of such revised plans and <br />specifications prepared by the University. Any revised plans and specifications for which the <br />County has not provided a response within fifteen (15) calendar days shall be deemed approved. <br />Should subsequent changes or modifications.be made to the-plans and specifications after they <br />have been approved, the County shall then have seven (7) days to review and approve such <br />changes or modifications. Any subsequently revised plans and specifications for which the <br />County has not provided a response within seven (7) days shall be deemed approved. Within a <br />reasonable time after completing constrution"~~f the LFG Collection System, but na longer than <br />:~ ~~ -~. ' <br />s 60 da s the Universi shall rovide ~o the (:: gun mall "as-built" plans and specifications <br />for the LFG Collection System. Until the <br />Collection System are provided to the County, <br />to the state <br />installed c'om <br />~j'` ,. <br />disruption to <br />Project. During the <br />construction of the LFG <br />~•,... <br />system. <br />and specifications for the LFG <br />shall keep the County informed as <br />ion System and the location of all then- <br />its employees, agents and subcontractors shall minimise <br />during construction, operation, and maintenance of the LFG <br />subcontractors shall <br />of this Agreement, the University, its employees, agents and <br />unreasonably interfere with the County's operation of the Landfill, <br />including, but not limited to, the County's closure of portions of the Landfill and any other <br />requirements under the Landfill Permits or applicable Laws, and shall reasonably ensure that the <br />Landfill is not damaged by the University. Should such damage occur, the University shall <br />16 <br />{00018638.DOC 16} <br />
The URL can be used to link to this page
Your browser does not support the video tag.