Orange County NC Website
38 <br />61. The operation, maintenance, and repair of the LFG Project shall be the sole <br />responsibility and undertaken at the sole cost and expense of the University (and its contractors <br />and agents) and shall be performed by the University, ,its employees, agents and subcontractors <br />(i) in compliance with all LFG Project Permits and applicable Laws and (ii) in accordance with <br />good engineering practices and industry standards. The University assumes the risk of the <br />delivery conditions (including the rate of flow, vacuum and pressure of delivery), quantity and <br />quality of LFG. ~ <br />62. The University is solely responsible foE;`ereatin~ sufficient vacuum to extract LFG <br />~~~, <br />~;w-;~~, <br />y~:.,;a, <br />from Landfill and transfer it to the Delivery Po' t'"~.~.`'`Tly, syvu~ch acuum shall not adversely affect <br />the County's Landfill operations, and the University slidjust its operations of the LFG <br />~~=~~ ~. <br />Project or install necessary equipment at its sole cost and expe~s~,t~orrect any such adverse <br />effect. Should such adverse effects arise that the University,~is~ unable to correct through <br />operational adj <br />commercially reasQrfab~le'~Steps to <br />of the conditions causing <br />63. The University <br />County in the preparation, <br />shall, at the County Manager's written request, take <br />suspend the LFG operations pending the correction <br />commercially reasonable efforts to cooperate with the <br />filing of any applications or other documents as may <br />be necessary to perform the County's obligations under this Agreement. <br />64. The University shall submit for the County's prior approval (which shall not be <br />unreasonably withheld), all permit documentation prepared in accordance with Paragraph 82 and <br />all construction and design plans and specifications relating to the construction, operation, and <br />maintenance of the LFG Collection System prior to commencing construction. The County shall <br />have fifteen (15) calendar days to complete its review and approval of any such plans and <br />15 <br />{00018638.DOC 16} <br />