Browse
Search
Agenda - 12-01-2008 - 3c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 12-01-2008
>
Agenda - 12-01-2008 - 3c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2008 12:47:29 PM
Creation date
12/1/2008 12:43:58 PM
Metadata
Fields
Template:
BOCC
Date
12/1/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
3c
Document Relationships
Minutes - 20081201
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br />Landfill Gas necessary to operate the Landfill in accordance with the Landfill Permits and all <br />applicable Laws. <br />56. The University agrees to flare any Landfill Gas delivered to the Delivery Point <br />that is not transported by the University to the Gas .Conversion System as follows: (i) during the <br />period occurring after the Flare Start-up Date and before the Engine Start-up Date; (ii) in the <br />event that LFG generated by the Landfill exceeds the capacity of the Gas Conversion System, as <br />determined by the University in accordance with good engineering practices and industry <br />~''~~ <br />standards; (iii) during Gas Conversion System maint.~,,;~"~ ce,pair, or associated downtime; (iv) <br />y"u `-. <br />as reasonably necessary to protect human health,~s~; or the~±euvironment; and (v) during the <br />~- ~ .r~~u <br />pendency of a force majeure event affecting the Gas Con` r~on System. <br />'_'.I~~:~b. <br />S7. The University shall have` _..~ n~ , t to use and <br />u. _ • . <br />such other property depicted on Exhibit <br />operation of the LFG Project, including any <br />LFG Project, or the design and permitting of <br />commercially <br />parcel a~~~property not <br />efforts to assist the <br />ions of the Landfill and <br />construction, and <br />to evaluate the feasibility of the <br />Project. The County agrees to make <br />;whenever feasible, in accessing any <br />solely by the County that is necessary for the construction and <br />LFG Proj <br />the Greene Tract. <br />ct~~ <br />S8. r"' e,,,~County s1-~1 grant the University, without additional University payment <br />s~:, ~ ~~ <br />beyond the compelsai:inY '~t ,forth in this Agreement, such easements and rights of way through <br />~~.;, <br />the Landfill site and ,, er property owned solely by the County as may be necessary to drill gas <br />extraction wells, lay pipelines, lateral lines, header lines, and any other part of the LFG Project <br />infrastructure as contemplated by this Agreement, including, without limitation, the easements <br />and rights of away set forth on Exhibit C. The County also grants the University, without <br />13 <br />{00018638.DOC 16} <br />
The URL can be used to link to this page
Your browser does not support the video tag.