Browse
Search
Agenda - 11-18-2008 - 6g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-18-2008
>
Agenda - 11-18-2008 - 6g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2008 12:55:16 PM
Creation date
11/17/2008 12:52:29 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes - 20081118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br />Attachment 5 <br />Ultra Shallow Trench Conventional Systems aze placed in areas with 24 inches or more of <br />provisionally suitable soiUsite characteristics and x6-10" soil cap is placed over the trenches. <br />Shallow Trench Conventional Systems' are placed in areas with 30 inches or more of provisionally <br />suitable soiUsite characteristics. <br />Conventional Trench Systems are placed in azeas with 36" inches or more of provisionally <br />suitable soil/site characteristics. <br />Inuovative Trench Systems can be used in areas with 24-36 "of provisionally suitable soiUsite <br />characteristics. <br />The approved septic areas should be kept free of vehicular traffic, ko~~in,g, aradin~, and <br />compacting activities. It is the responsibility of the property owaer or developer to maintain the <br />integrity of the septic areas prior to system construction and installation. No parking, cutting or <br />filling shall be allowed in or around the drain field areas. <br />Drainage ways and easements should be utilized to convey storm water run-off to the storm waxer <br />retention areas. These conveyances should not be,located through designated septic drain field <br />areas. <br />fihis report is for planning purposes only and does not constitute any approval. Lot approval is <br />granted by the health department only in the form of am Improvement Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.