Browse
Search
Agenda - 11-18-2008 - 6g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-18-2008
>
Agenda - 11-18-2008 - 6g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2008 12:55:16 PM
Creation date
11/17/2008 12:52:29 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes - 20081118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 13 <br />collector road right-of-way standards as identified in the Comprehensive <br />Plan and required in Section IV-B-3-c-1 of the Subdivision Regulations. <br />C. Land Use Buffers and Landscaping <br />Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and shall be inspected and approved by the Planning and <br />Inspections Department prior to signatures on final plat. No part of the <br />landscaping shall encroach into the 10' x 70' sight triangles at the <br />intersection. <br />OR <br />Guaranteed financially through a letter of credit or escrow agreement <br />submitted to secure required landscape installation and preservation. An <br />estimate of the cost for required preservation, plantings and their installation <br />must be provided. The financial guarantee shall reflect 110% of the <br />estimate and be issued by an accredited financial institution licensed to do <br />business in North Carolina in a form approved by the County Attorney. <br />Provisions for protection of existing trees as shown on the approved <br />landscape plan shall be included in a document describing development <br />restrictions and requirements to be prepared by Planning Staff and <br />recorded concurrently with the Final Plat. No clear cutting on individual lots <br />is permitted pursuant to Section IV-B-8-c of the Orange County Subdivision <br />Regulations. <br />2. In accordance with Article 12.6 of the Orange County Zoning Ordinance a <br />type E 75-foot buffer shall be maintained (i.e. left undisturbed) along <br />existing Old NC 86. Language shall be provided in the Homeowners <br />Association documents to the effect that clearing within the 75 foot buffer <br />along existing Old NC 86 is not permitted with the exception of septic <br />system repair areas. <br />3. In accordance with Article 12.6 of the Orange County Zoning Ordinance a <br />type A 30-foot buffer shall be maintained (i.e. left undisturbed) along New <br />Hope Church Road. Language shall be provided in the Homeowners <br />Association documents to the effect that clearing within the 30 foot buffer <br />along New Hope Church Road is not permitted with the exception of septic <br />system repair areas. <br />D. Drainage <br />1. Drainage Easements shall be located on the final plat as required following <br />review and approval of the Erosion Control Plan by County staff. <br />2. Drainage culverts shall be sized and located appropriately by a licensed <br />North Carolina Professional Engineer as required by NCDOT and Orange <br />County Erosion Control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.