Browse
Search
Agenda - 11-18-2008 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-18-2008
>
Agenda - 11-18-2008 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2008 11:23:34 AM
Creation date
11/17/2008 11:23:24 AM
Metadata
Fields
Template:
BOCC
Date
11/18/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20081118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-084 Comprehensive Plan Update Phase II
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 6, 2008 Draft Comprehensive Plan <br />Table of BOCC Additional Revisions <br />~ ~* ~ Revisions Following Oct. 14th BOCC Work Session and Nov. 6th Regular Meeting *Line <br />~ ~ ~ items changed since the Nov. 6th BOCC version are shaded in the far left hand column and <br />.~ a ~ changes conveyed in italics) <br /> Objective WW-4: Maintain a cooperative joint planning process among the County, the <br />85 8-11 34-36 municipalities, and water and wastewater providers and guide the extension of service in <br /> accordance with the Comprehensive Plan, the Orange County-Chapel Hill- Carrboro Joint <br /> Planning Agreement and Land Use Plan, and the policies of the municipalities . <br /> Revise as recommended by the Planning Board with revisions as indicated. Objective WW-9: <br /> Ensure that public water and sewer services are provided in those areas that can be practically <br />86 8-12 11-16 and efficiently served by these facilities, as provided in the Orange County-Chapel Hill- <br /> CarrboroJoint Planning Agreement and Land Use Plan ' , <br /> Ga~bere, and as delineated in the Water and Sewer Management Planning and Boundary <br /> Agreement, as well as any inter-local government pact that implements the Agreement." <br />87 8-24 21-23 Objective SW-2: Encourage the recycling of solid waste, including but not limited to the <br /> preference for deconstruction practices over demolition, to minimize waste disposed of in landfills. <br />88 8-29 6 "...The Sheriff and h+s Sheriffs deputies..." <br />89 8-31 18-20 Services and Community Facilities Goal 7: Efficient and effective public safety, including <br /> police, fire, telecommunications, emergency services, and animal services. <br />90 8-32 4 Objective incorrect) numbered. To be corrected throu hout. <br /> Add the following additional objective recommended by the Planning Board with revisions as <br /> indicated: Objective PS-T-8: Maintain a radio communication system that ensures reliable <br />91 8-32 12 notification and ser~r$I oversight of emergency assets, such as personnel, vehicles, and <br /> response equipment, throughout Orange County and inter-operability of communication among, <br /> 'urisdictions . <br /> Revise as recommended by the Planning Board with revisions as indicated. "Construction of this <br />92 8-33 33-34 facility, which will be located on Margaret Lane in Hillsborough, began is anticipated in A~ <br /> 2009." <br />ao. <br />w <br />11/18/2008 11 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.