Orange County NC Website
May 6, 2008 Draft Comprehensive Plan <br />Table of BOCC Accepted Planning Board Revisions <br />(Line items revised by the BOCC have been noted where applicable) <br /> . m <br />,~ a <br />~ ~, <br /> PB Proposed Revision ° w ~ ~ <br /> (Chapter breaks and new objectives are shaded) ~ ~ <br /> a ~ a <br /> <br /> <br />a <br />~i <br />c~ <br />_ <br />'~ O ~ a~ <br />~ o <br />~ <br />_ a ~ Oma om <br />54) 6-66 29-30 Renumber goals. Change " " to (Goals 7 and 8) ELAB g/10/2008 <br /> Staff <br />55) 6-66 33 Goal is misnumbered. Natural & Cultural Systems Goal 6 7: A balanced ELAB g/10/2008 <br /> and health ... Staff <br /> <br />56) <br />6-67 <br />25 Goal is misnumbered. Natural & Cultural Systems Goal ~ 8: Networks of ELAB <br />9/10/2008 <br /> rotected ... Staff <br />57) 6-69 15 "•..interactive.natura) system that reacts to human activity manifested in ELAB g/10/2008 <br /> reduced ~•~°"~~and stream flow..." Staff <br />58) 6-70 9-24 <br />Rewrite paragraphs per Attachment 6.4.5. ELAB <br />Staff g/10/2008 <br /> <br />59) <br />6-73 <br />19 "The geological characteristics of Orange County, in which the ground water ELAB <br />9/10/2008 <br /> cis resources reside..." Staff <br /> <br />60) <br />6-74 <br />9 Chan a reference to H dro eolo is Ma Appendix Map D-10: <br />g Y g g p- `~- ELAB <br />9/10/2008 <br /> Oran a Count Geolo Staff <br />61) 6-79 2 Lower case: "nitrogen" and "phosphorus„ ELAB g/10/2008 <br /> Staff <br />62) 6-77 29-33 Text changed by Clarion? Not recognized -confusing. See BOCC Table of ELAB g/10/2008 <br /> Revisions Staff <br />63) 6-81 "Figure 6-~9: Recharge Rates By Watershed / Subbasin in Orange County" ELAB g/10/2008 <br /> Staff <br />N <br />V <br />11/18/08 Atl comments from the May and August Public Hearings were considered by the Planning Board during its review process. 23 of 32 <br />