Orange County NC Website
I ■On-Site Wooded, Topographic Relief or Other Features <br />2 •Impacts on Existing Businesses <br />3 -Buffer Zones and Screening Measures <br />4 NOff-Site Wooded, Topographic Relief, or Other Features <br />5 *Traffic Compatibility <br />6 ■Street or Roadway Connector Access to Major Arterials and Highways <br />7 ■Proximity to Bike Routes, Schools, etc. <br />8 -Impact on Historic or Cultural Features <br />9 E Number of Features within 1000 Feet of Site <br />10 -Cost Consideration <br />11 ■Site Development Costs <br />12 mAssessed Tax Value <br />13 <br />14 Community-Specific <br />15 Site Evaluation Summary <br />16 <br />17 Community- Specific Site Evaluation Summary <br />18 <br />19 Technical Site <br />20 Evaluation Summary <br />21 <br />22 Technical & Community- Specific Site Evaluation Summaries <br />23 <br />24 <br />25 3. Discuss Results of Technical Criteria along side Results of Community- Specific <br />26 "Criteria <br />27 <br />28 Bob Sallach reiterated that the rank is simply the numeric point total and does not <br />29 represent the recommendation to the Board or the Board's desire. The highest ranked site is <br />30 #759. He said that there is a significant break after the sixth site in terms of total points. <br />31 He went through the Technical and Community- Specific Evaluation Summaries, which <br />32 showed the ranking of the sites based on both sets of criteria. For example, site 857 had a <br />33 technical criteria ranking of 1 but a community-specific criteria ranking of 6. <br />34 He said that this is presented to the Board for further consideration. <br />35 <br />36 Chair Jacobs said that Commissioner Carey could not be here and is en route from the <br />37 airport and may be here later. He said that the Board of County Commissioners at its meeting <br />38 last week established that it did not want to have more than three candidate sites. <br />39 Commissioner Foushee pointed out that the Board did not officially decide on three sites, <br />40 but there was a general consensus. <br />41 Bob Sallach pointed out that in this consideration, there is one site that is freely offered for <br />42 sale, and this is site 056. <br />43 Commissioner Foushee made reference to the number of sites off of NC 54 and if anyone <br />44 has measured the distance from these sites to the 1-40/1-85 connector. Bob Sallach said that <br />45 they have looked at distances and travel time from the centroid of waste generation to the site, <br />46 but not to the station itself. He said that the travel pattern from the transfer station will be <br />47 somewhat dictated on where ultimate disposal is. <br />48 Commissioner Nelson said that, in looking at the community-specific and technical criteria, <br />49 it seems that there is a fairly clean break between the top four sites and the fifth site. <br />