Browse
Search
Agenda - 09-21-1999 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-21-1999
>
Agenda - 09-21-1999 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 10:50:59 AM
Creation date
11/6/2008 2:37:21 PM
Metadata
Fields
Template:
BOCC
Date
9/21/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 19990921
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a porous medium, as is the case in the report, the <br />hydraulic conductivity from the slug test will be <br />underestimated by a factor of 20/(1/2) = 40. <br />• Applying the concepts of porous medium (Report, <br />p. 19) and hydraulic conductivity (Report, p. 20) <br />to the fractured bedrock is highly questionable, es- <br />pecially for contaminant transport. <br />• The effective porosity has not been even measured. <br />The accepted value of "less than M' is taken from <br />literature [Heath, 1989] that was not subjected to <br />the stringent quality control of peer- review process. <br />• The reference relied on in establishing the flow <br />regime [LeGrand, 19881 is not listed in bibliog- <br />raphy. <br />• Report, p. 18, "[The upper aquifer] material can <br />be reasonably described as hydraulically isotropic." <br />• The 25 -year storm design criterion for storm wa- <br />ter control is highly questionable in the vicinity of <br />drinking water wells and the stream, as demon- <br />strated by the recent storm. <br />• Waste screening process in admitting waste to the <br />landfill has been assumed perfect. Note that small <br />amount of paint solvents can easily be missed and <br />can reach groundwater leaching from the landfill <br />proposed to be constructed WITHOUT A LINER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.