Browse
Search
Agenda -11-06-2008 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 3:44:09 PM
Creation date
11/4/2008 2:51:38 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n" chapter 9: Transportation EIement <br />^~•., <br />2 ^ Long-Range Transportation Plan. The plan is a guide for major transportation <br />3 investments in the Durham-Chapel Hill-Carrboro Metropolitan Planning <br />4 Organization area. It is designed to support land use and air quality goals for <br />5 the urban area, and is prepared in accordance with federal requirements. The <br />6 plan projects the amount and type of transportation demand over a 20-year <br />7 minimum period, and is updated every four years to <br />8 demonstrate compliance with air quality standards. It <br />9 identifies priority highway, bus transit, rail transit, bicycle, and pedestrian <br />10 improvements needed to service future populations, and the projected costs of <br />11 these improvements. The LOng Range Transportation Plan is <br />12 fiscally constrained and identifies viable anticipated <br />13 funding sources for projects proposed in the plan. <br />14 =- <br />15 ' <br />16 <br />17 <br />18 ' <br />19 = Metropolitan Transportation Improvement Program. <br />20 <br />21 <br />22 ' <br />23 <br />24 <br />2s This program is a seven year document that is included in <br />26 the Statewide Transportation Improvement Program and <br />27 contains funding and scheduling information for bicycle, <br />28 pedestrian, highway, rail, public transportation, and <br />29 enhancement projects. Every two years, the Metropolitan <br />3o Plannin_g Organization develops a prioritized list of <br />31 projects to be considered for funding in the biennial <br />32 update of the Metropolitan Transportation Improvement <br />33 Program. Projects must come from adopted <br />34 transportation plans. <br />35 =- <br />36 <br />37 ' <br />38 <br />39 <br />40 ' <br />41 <br />42 <br />43 <br />44 <br />73 <br />C~~la.~u~iGcrun2ty Co-m~r~h~~iv~i~Zu,w Public Hearing Draft 5-6-08 Page 9-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.