Orange County NC Website
May 6, 2008 Draft Comprehensive Plan <br />Planning Board's Table of Proposed Revisions Minus Line Items Revised by BOCC <br />(Line items revised by the BOCC have been noted where applicable) <br /> m <br />,~ a <br />° ~ <br />~ ~, <br /> PB Proposed Revision w ~ _ <br /> (Chapter breaks and new objectives are shaded) ~ <br /> a ~ o. ° <br />~ <br />~ ~ <br />o ~ .c V ci ~ <br />o -p <br /> d <br />c mU o ~ <br />_ a ~ Oma om <br />54) 6-66 29-30 Renumber goals. Change " " to <br />(Goals 7 and 8) 9/10/2008 <br /> _ Staff <br />55) 6-66 33 Goal is misnumbered. Natural & Cultural Systems Goal 6 7: A balanced ELAB g/10/2008 <br /> and health ... Staff <br /> <br />56) <br />6-67 <br />25 Goal is misnumbered. Natural & Cultural Systems Goal ~ 8: Networks of ELAB <br />9/10/2008 <br /> rotected ... Staff <br />57) 6-69 15 "••.interactive natural system that reacts to human activity manifested in ELAB g/10/2008 <br /> reduced ~•~°"..~,'~e',Tand stream flow..." Staff <br />58) 6-70 9-24 <br />Rewrite paragraphs per Attachment 6.4.5. ELAB <br />Staff g/10/2008 <br /> <br />59) <br />6-73 <br />19 "The geological characteristics of Orange County, in which the ground water ELAB <br />9/10/2008 <br /> s resources reside..." Staff <br />60) 6-74 g Change reference to Hydrogeologic Map - #lap-6-2-Appendix Map D-10: ELAB g/10/2008 <br /> Oran a Count Geolo Staff <br />61) 6-79 2 Lower case: "nitrogen" and "t~phosphorus" ELAB g/10/2008 <br /> Staff <br />62 <br />) 6-77 29-33 Text changed by Clarion? Not recognized -confusing. See BOCC Table of ELAB <br />9/10/2008 <br /> Revisions Staff <br />63) 6-81 "Figure 6-89: Recharge Rates By Watershed / Subbasin in Orange County" ELAB g/10/2008 <br /> Staff <br />~. <br />11/06/08 All comments from the May and August Public Hearings were considered by the Planning Board during its review process. 23 of 32 <br />