Browse
Search
Agenda -11-06-2008 - 6b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 6b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 3:44:09 PM
Creation date
11/4/2008 2:51:38 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6b
Document Relationships
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: November 6, 2008 <br />Agenda ~ r <br />Item No. <br />SUBJECT: Comprehensive Plan Update Phase II <br />DEPARTMENT: Planning & Inspections PUBLIC HEARING: (Y/N) 0 <br />ATTACHMENT(S): INFORMATION CONTACT: <br />1) Draft BOCC Table of Revisions (pp. 1-18) ,Tom Altieri, Comprehensive Planning <br />2) Planning Board's Table of Proposed Revisions Supervisor, 245-2579 <br />Minus Line Items Revised by BOCC (pp. 19-86) <br />(Under Separate Cover) <br />(Draft Comprehensive Plan received with <br />May 19, 2008 Public Hearing materials) <br />PURPOSE: To review the draft BOCC Table of Revisions and convey any final changes to the <br />draft Comprehensive Plan that may be required by the Board. <br />BACKGROUND: <br />Process <br />On October 3, 2006, the Board of County Commissioners (BOCC) approved a process for <br />updating the County's Comprehensive Plan in two phases as follows: <br />Phase I, to include the development of Comprehensive Plan goals and County Profile <br />Element; and <br />Phase II, to include the remaining seven (7) Elements of the updated Comprehensive Plan. <br />Phase I was completed by the County in September 2007. and Phase II was initiated <br />immediately thereafter. <br />Phase II of the update process included public input meetings on January 28th, April 3`d, April Stn <br />and April 23~d. Several public input opportunities were also provided during Phase I of the <br />process. Public hearings were held on May 19, 2008 and August 25, 2008 to receive formal <br />public comments on the draft Comprehensive Plan, dated May 6, 2008. <br />Revisions to the May 6th draft Comprehensive Plan have been prepared for BOCC <br />consideration (Attachments 1 and 2). Originally, revisions were to be incorporated into the May <br />6th draft Plan prior to BOCC adoption consideration. However, to accommodate the additional <br />public hearing on August 25th and still meet the targeted adoption date, the BOCC amended its <br />update process. The amended process includes BOCC consideration of the May 6th draft Plan <br />with a list of specific revisions, which will be incorporated into the Plan by the County's planning <br />consultant following adoption. <br />
The URL can be used to link to this page
Your browser does not support the video tag.