Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, North Carolina <br />Attn: Pam Jones, Director of Purchasing and Central Services <br />Post Office Box 8181 <br />Hillsborough, North Carolina 27278 <br />To the CMAR: <br />RESOLUTE BUILDING COMPANY <br />Attn: I(im Vrana, President <br />P.O. Box 3656 <br />Chapel Hill, North Carolina 27515 <br />11.9 Bonds• <br />In .accordance with N.C. Gen. StaL §143 - 128.1, the OMAR <br />shall provide a performance bond with a penal sum equal to <br />100% of the Guaranteed Maximum Price to guarantee the <br />faithful performance of the Work, in such form as may be <br />required by law and by the Owner. <br />In accordance with N.C. Gen. Stat §143 - 128.1, the CMAR <br />shall provide a payment bond with a penal sum equal to 100% <br />of the Guaranteed Maximum Price to guarantee the payment of <br />all labor and material costs or claims In connection with <br />compliance with the Contract, In such form as may be required <br />by law and by the Owner. <br />These bonds shall be dated the same date as the Agreement <br />and must be accompanied by a current copy of the power of <br />attorney for the attomey4n -fact executing such bond on behalf <br />of a surety company licensed to do business in the state of <br />North Carolina and reasonably acceptable to the Owner. If <br />required by the Owner, these bonds shall name additional <br />obligees to indude any lender providing financing for the <br />Project, the North Carolina Local Government Commission and <br />any other joint obligee reasonably required by the Owner. <br />In its Guaranteed Maximum Price, the CMAR shall Include a <br />program and costs for bonds or other security against default <br />by Contractors as the CMAR deems appropriate to protect the <br />CMAR and the Owner against such defaults. <br />11.10 Ownership of Documents <br />The CMAR shall be' entitled to maintain possession of a <br />reasonable number of sets of Contract Documents and record <br />documents during and after the completion of the Project for Its <br />records. After completion of. the Project, the CMAR shall <br />destroy . or return to the Owner all other copies of such <br />documents as requested by the Owner. The CMAR shalt not <br />reproduce or distribute such documents to any third person or <br />for any purpose other then bidding, permitting and construction <br />of the ProjecL The CMAR shall have no copyright or other <br />rights in the documents, or other rights to use the documents. <br />ARTICLE 12 <br />SPECIAL GUARANTEED MAXIMUM PRICE PROVISIONS <br />12.1 Gugranteed Maximum Price <br />Pursuant to this Agreement and for the Project defined in <br />Article 2, the Owner and the CMAR have -set a Guaranteed <br />Maximum Price for the Project of an amount not to exceed <br />T.B.D. <br />12.1.1. D_ocumtenkgon <br />The .Guaranteed Maximum Price documentation shall be <br />prepared by the CMAR and submitted to the Owner with the <br />Guaranteed Maximum. Price Proposal._ The documentation <br />shall at a minimum describe the Contract Documents on which . <br />-the Guaranteed Maximum Price Proposal Is based, "and set <br />forth the cost elements of the Guaranteed Maximum Price in <br />detail. The documentation may indude drawings, sketches, <br />specifications, calculatigns or other data used to Identify the <br />basis of the Guaranteed Maximum Price. Documentation of the <br />Guaranteed Maximum Price was developed by the CMAR from <br />the design Drawings and Specifications and such other <br />documents as may be described in the Proposal. . <br />12.1.2 Budget Items <br />The documentation of the Guaranteed Maximum Price 'shall <br />Include a detailed cost tabulation with at least the elements <br />described in the Listing of Cost Elements in Appendix B. - <br />12.1.3 CMAR Contingency <br />The Guaranteed Maximum Price shall Include a contingency <br />amount (the Contingency) for the use of the CMAR The <br />Contingency shall be included In the Guaranteed Maximum <br />Price. The Contingency is for the use of the CMAR to defray <br />costs In excess of the Cost of the Work for which the CMAR is <br />not otherwise entitled to an. increase in the Guaranteed <br />Maximum Price under the terms of this Agreement <br />12.1.4 "Con.sjWcdon Contract Price Savings and Overruns <br />The CMAR shall as part of cost control under its Basic Services <br />report the adjusted final actual price of each item or division of - <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.