Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and the Designer at mutually convenient times throughout the <br />duration of the Project and for a period of three years after <br />completion of the CMAR's Services. <br />7.4.4 Payments <br />Payments to the CMAR shall be made monthly. The CMAR <br />shall submit an Application far Payment, acceptable to the <br />Owner and _the Designer, no later than the twenty fifth of each <br />month.'The Owner shall make payment as required by the <br />accepted application no later than the twentieth of the following <br />month as follows: <br />7.4.4.1 Seventy five percent (76%) of the Fixed Fee shall be <br />paid monthly in amounts prorated equally over the duration of <br />the CMAR's Services. The duration shall be as set out in <br />Article 4. The remaining twenty five percent (25%) of the Fixed <br />Fee shall be payable in fuil upon final completion of the Project. <br />.7.4.4.2 Payment of General Conditions casts shall be based on <br />the cash flow schedule of payments prepared by the CMAR <br />and submitted with the General Conditions cost proposal, <br />which shall be converted to a fixed schedule of payments when <br />the Guaranteed Maximum Price is fixed. <br />7.4.4.3 Payment of the actual • verifiable Cost of the Work <br />completed to date and not previously invoiced and paid, less <br />retainage withheld from the Contractors. Except with the <br />Owner's prior approvat, payments allocated to the CMAR and <br />the Contractors shall be subject to a retention of ten (10%). <br />Whenever any Contractor completes its Work on or before a <br />target date mutually agreed upon by the Owner, Designer and <br />the CMAR, and the Designer and Owner agree the Work Is <br />satisfactorily completed, the Owner may reduce the amount of <br />retainage. on that Contractor by fifty percent (50 %) for the <br />remainder of the Project. <br />7.4.4.4 Payments.due to the CMAR that remain unpaid for <br />more than thirty (30) days from the date of receipt by the <br />Owner and the Designer of the CMAR's acceptable invoice <br />shall bear interest at the statutory rate. <br />The CMAR shall purchase and maintain Insurance that shall <br />protect the CMAR from the claims set forth below that • may <br />arise out of or result from the CMAR's performance of services <br />pursuant to this Agreement.. <br />Claims under Workers' Compensation,. disability benefds and <br />other similar employee benefits acts that are applicable to the <br />Work performed; <br />Claims for damages because of bodily injury, occupational <br />sickness or disease or death of CMAR's employees under <br />applicable employer's liability law; <br />Claims for damages because of bodily injury or death of any <br />person other than CMAR's employees; <br />Claims for: damages insured by usual personal injury liability <br />coverage that are sustained by any person as a result of an <br />offense directly related to the employment of such person by <br />the CMAR or by any other person; <br />Claims for damages, other than to the Work itself, because of <br />injury to or destruction of tangible property, including loss or <br />use therefrom.; <br />Claims for damages . because of bodily injury or death of any <br />person or property damage arising out of ownership, <br />maintenance or use of any motor vehicle; and <br />Claims for professional liability against any design professional <br />engaged by the CMAR or the Contractors as required by the <br />Contract Documents for fabrication or installation of <br />components of the Project. <br />The CMAR shall include similar requirements in all Contracts <br />for Contractors, with limits and coverage terms acceptable to <br />the Owner. <br />8.1.1 Coverace Limits <br />Workers Compensation shall be maintained with at least the <br />minimum 'statutory limits. The CMAR's commercial general <br />and motor vehicle liability insurance shall be written for not less <br />than the following limits of liability: <br />
The URL can be used to link to this page
Your browser does not support the video tag.