7.3.1.2 By unit prices defined in a contract with a Contractor; or <br />7.3.1.3 By the cost of such Work determined on the basis of <br />the cost records for the changed work. In the event actual <br />costs are to be reimbursed, the CMAR shall keep and present <br />In such form as may be agreeable to the Owner and Designer <br />an itemized accounting together with appropriate supporting <br />data of the actual Cost of the Work. <br />7.3.2 Directive to Proceed <br />In the event the CMAR and the Owner cannot agree that an <br />adjustment to the Guaranteed Maximum Price or the Master <br />Schedule is warranted, or. cannot agree on the compensation <br />for a change in the Work or on an- increase in the Guaranteed <br />Maximum Price, the CMAR shall, if so directed by the Owner in <br />writing, nevertheless proceed with the Work, and any <br />adjustment to the Guaranteed Maximum Price shall be <br />negotiated by the parties at.a later date, utilizing the dispute <br />resolution procedures under this Agreement if necessary. <br />7.3.3 Unit Prices <br />If unit prices are utilized in the. Guaranteed Maximum Price, the <br />Guaranteed, Maximum Price Proposal shall .document the <br />estimates on which the unit prices are based. If the CMAR <br />later determines that the quantities on which unit prices are <br />based will vary from the quantities utilized by the CMAR to fix <br />the unit prices and calculate"the Guaranteed Maximum Price, <br />the CMAR shall within five (5) days after determining that the <br />quantities will vary from the estimates notify the Designer and <br />the Owner In writing and forecast the amount of the variance. <br />If the estimated quantities available to and used by the CMAR <br />to, establish the unit prices are so changed that application of <br />the agreed unit prices to the quantities or work proposed cause <br />substantial Inequity to the Owner or the CMAR, the applicable <br />unit prices and Guaranteed Maximum Price shall be adjusted. <br />7.3.4 Unforeseen Conditions <br />Should the CMAR encounter unforeseen conditions at the <br />Project site materially differing from those • shown on the <br />Drawings or indicated In 'the* Specifications. or differing <br />materially. fran those ordinarily ;encountered and generally <br />recognized as inherent in work of the character provided for in <br />this Agreement, the. CMAR shall. immediately, and in no event <br />more than five (5) days later, give notice to the Owner of such <br />conditions before they are disturbed. The Owner and the <br />23 <br />Designer shall thereupon promptly investigate the conditions <br />and if they find that they materially differ from those shown on <br />the Drawings or Indicated In the Specifications, they shall at . <br />once make such changes in the Drawings and/or Specifications <br />as they -may find necessary. Any increase or deixease in the <br />Guaranteed Maximum Price resulting from such changes shall <br />be adjusted in the manner provided herein for adjustments as <br />to extra and/or additional Wait and changes. However, neither <br />the Owner nor the Designer shall be liable or responsible for <br />additional work, costs, or changes to the Work that could have <br />been reasonably determined from any reports. surveys,_ and <br />analyses made.avallabie for the CMAR's review or that could <br />have been discovered by. the CMAR through the performance <br />of its obligations pursuant to the Contract Documents: <br />7.3.5 Minor Chanaes <br />The Designer shall have the authority to order minor changes <br />In the Project consistent with the intent of the Drawings and <br />Specifications and not involving an. adjustment In the <br />Guaranteed Maximum Price or change of the construction <br />completion date. Such changes may be affected by written <br />order only. <br />7.4 Fbmd Fee and General Conditions Costs <br />The Owner shall compensate the CMAR for. the CMAR's Fixed <br />Fee and reimbursable General Conditions Costs in accordance <br />with the terms and conditions of this Agreement as specifically <br />as follows: <br />7.4.1 Fixed Fees <br />The Fixed Fees payable to the CMAR shall be: <br />Six Thousand Five Hundred Dollars ($5,500) for the pre - <br />construction reimbursables and procurement phases- which <br />amount is Included In the GMP provided the GMP is accepted <br />by the Owner. If the GMP is not accepted by the Owner the <br />CMAR is entitled to the cost of services rendered rot to exceed <br />$18,000; and, for the construction and post- construction <br />phases, a fee equal to seven percent (7%) of the Cost of the <br />Work set forth In the original agreed Guaranteed Maximum <br />Price. In the event the original agreed Guaranteed Maximum <br />Price is adjusted between the time It is fixed and the end of the <br />Project, the Fixed Fee shall be adjusted In accordance with <br />Paragraph 5.1.2.1 of this Agreement. <br />7.4.2 General Conditlons _ <br />Genera[ - Conditions Costs shall Include the categories of costs <br />described as General Conditions'Costs In the listing of Cost <br />