Orange County NC Website
6.1 PCB <br />The Owner shall provide to the CMAR complete information <br />regarding the Owner's requirements for the Project. <br />6.2 Decisions <br />The Owner shall examine information submitted by the CMAR <br />and shall render decisions thereto promptly. <br />6.3 Insurance <br />The Owner shall fumish the Insurance that the Owner has <br />agreed to furnish as specified in Article S. <br />6.4 Notice of Nonconformities <br />If the Owner observes or otherwise becomes aware of any fault <br />or defect In the Project or nonconformity with the Contract <br />Documents, the Owner shall give prompt written notice thereof <br />to the CMAR. <br />6.5 Approvals <br />The Owner shall furnish required information and approvals <br />and perform Its responsibilities and activities in a timely manner <br />to facilitate orderly progress of the Work in cooperation with the <br />CMAR, consistent with this Agreement, and in accordance with <br />the planning and scheduling requirements and budgetary <br />restraints of the Project <br />6.6 Designer <br />The Owner shall retain a Designer whose services, duties and <br />responsibliMes shall be described in a written agreement <br />between the Owner and Designer. The services, "duties, and <br />responsibilities of the Designer set out in the agreement <br />between the Owner and Designer shall be compatible and <br />consistent with this Agreement and the Contract Documents. <br />The Owner shall, in its agreement with the Designer, require <br />that the Designer perform its services In cooperation with the <br />CMAR, consistent with this Agreement and in accordance with . <br />the planning, scheduling and budgetary requirements of the <br />Project as determined by the Owner. The terms and conditions' <br />of the agreement between the Owner and the Designer shall <br />not be changed or waived without written notice to the CMAR <br />provided at the time of the change or revisiop. <br />6.7 Budae <br />20 <br />The Owner shall establish the Project and Constriction Budget <br />and approve subsequent revisions deemed acceptable as <br />provided to this Agreement <br />6.8 Separate Contracts" <br />The Owner reserves the right to contract separately with other <br />entities to complete portions of the Work of the Project, or to <br />deploy its own employees to complete pardons of the Work. If <br />the Owner contracts separately with any other parties, the <br />Owner shall cause all such agreements to be compatible and <br />consistent with this Agreement. Each of the agreements shall <br />Include waiver of subrogation as required herein. The CMAR <br />agrees to cooperate with the Owner and Its separate <br />contractors and coordinate the Work of all parties, Including the <br />Owner's forces or separate contractors. Provided the CMAR <br />has reasonable advance notice of the Identity and duties of <br />separate contractors, the CMAR agrees to include coordination <br />and support of the Owner's separate contractors In the General <br />Conditions costs. Disputes or conflicts between the CMAR, the <br />Owner and any separate contractors shad be subject to dispute <br />resolution in accordance with the dispute resolution provisions <br />In Appendix A. <br />6.9 Copies of Drawinas and Specification§ <br />The CMAR shall estimate the reasonable number of copies of <br />Interim and final drawings, specifications and Contract <br />Documents required by the CMAR, and shall obtain such <br />copies from the Designer at the CMAR's expense. The <br />estimated cost of such copies shall be included in the <br />Guaranteed Maximum Price. <br />6.10 Permits and Approvals <br />With the cooperation and assistance of the CMAR and the <br />Contractors as set forth In this Agreement, the Owner shall In a <br />timely manner secure, submit and pay for necessary approvals, <br />easements, assessments, permits and charges required for the <br />conduction, use or occupancy of permanent structures, or for <br />permanent changes in existing facilities. <br />6.11 Fundno Reauirements - <br />The Owner shall describe the funding for the Project to the <br />CMAR and the Designer. <br />6.12 Communication with Contractors <br />The Owner, Its representatives and consultants, including <br />Designers, shall . communicate with the Contractors only <br />through the CMAR. <br />