Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Completion Date shown :on the Master. Schedule, or as such <br />Compledon.Date may have been adjusted. " <br />41 Schedule Monitoring <br />The Designer and Owner shall. monitor progress of the Work <br />and the. CMAR shall- cooperate with such monitoring and <br />provide any "and all information with respell to the progress of <br />the Work ,and scheduling as the. Owner. or Designer may <br />reasonably require. <br />4.8 Schedule Revisions . <br />On a monthly basis, the CMAR shall revise the Master <br />Schedule, showing any adjustments made In accordance with <br />this Article, by any Change Order, the progress of the Work, <br />and any days gained or days lost with respect to any activity, <br />and shall fumish copies thereof to the Owner and Designer. <br />4.8 Withholding Payment from CMAR <br />Should any monthly revision of any Master Schedule show that <br />the CMAR is behind on any critical activity, the late completion <br />of which could delay Substantial Completion of the Work, the <br />Owner shall be entitled to withhold from the next Progress <br />Payment due the CMAR an amount not exceeding the amount <br />the Owner would be entitled to in Liquidated Damages, should <br />Substantial Completion be delayed by the same number of <br />days that the CMAR is currently behind schedule. lf, <br />subsequently, the Project progress, as shown by any <br />succeeding monthly revision to the Master Schedule, Is such <br />that the anticipated delay no longer exists, the Owner shall pay <br />with the Progress Payment next due to the CMAR such <br />amounts as have been withheld In accordance with this <br />paragraph. <br />4.10 Work by Owner <br />If the CMAR, within a period of five (5) days after notice that it <br />Is behind In a critical activity or is otherwise in default under this <br />Agreement, shall not proceed In good faith and with reasonable <br />speed to correct such delay or default in accordance with such <br />notice, the Owner shall have full power and authority to take <br />the prosecution of the Work out of the hands of the CMAR, to <br />appropriate or use any br all materials and equipment at the <br />Project as may be suitable and acceptable, and to enter into <br />'other agreements for the completion of the Work or pursue <br />such. other methods as In the Owner's sole discretion and <br />opinion shall be necessary or appropriate for the completion of <br />the Work in an acceptable manner. The Owner shall have the <br />right to perform Work, hire and employ labor and craftsmen, <br />17 <br />tent equipment, subcontract with other parties, or do anything <br />that the Owner deems necessary or appropriate to remedy or <br />cure any delay or default by the CMAR In the progress of the <br />Work. Such action by the Owner shall not in any way, affect, <br />void or limit any warranty, guaranty or other responsibility of the <br />CMAR under the Contract Documents. Such action may be <br />taken by the Owner only after five (5) days written notice to the <br />CMAR.. All costs incurred by the Owner.in taking any such <br />action shall be charged to the CMAR and deducted from any <br />amounts due under the Agreement. <br />4.11 Force Majoure <br />The CMAR may be entitled to an extension of the time for <br />completion -(but no increase in the Guaranteed Ma)dmum Price <br />except as described In this Paragraph 4.11) for delays arising <br />from unforeseen causes beyond the control and without the <br />fault or negligence of the Owner, the OMAR or the CMAR's <br />Contractors as follows-. <br />4.11.1 Ads of God, tomado, fire, hurricane or earthquake that . <br />damage completed Work or stored materials. <br />4.11.2 Acts of sabotage that damage completed work or stored <br />materials. <br />4.11.3 Labor disputes at the project site. <br />4.11.4 Unavoidable casualties that damage completed work or <br />stored materials. <br />4.11.5 Acts of the public enemy. <br />4.11.6 Acts of the State, Federal, or local government in their <br />sovereign capacities. " <br />4.11.7 -Abnormal Inclement weather as defined In <br />Paragraph 4.13. <br />If the Faroe Majeure delay Is greater than 120 days, the Owner <br />shall consider and, If reasonable, approve a request for an <br />adjustment to the GMP.for the additional costs caused by the <br />force majeure delay beyond the 120 day period. <br />The CMAR and the Contractors shall not be entitled to and <br />hereby expressly walve and extension of.time.resulting from <br />any condition or. cause unless a_ claim for extension. of time Is <br />
The URL can be used to link to this page
Your browser does not support the video tag.