Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMAR on account of such action shall be determined as <br />provided for under Article 7 herein. <br />3.10.15.11 If reasonable precaWons are inadequate to prevent <br />foreseeable bodily injury or death to persons resulting from a <br />material or substance encountered but not created on the site <br />by the CMAR or its Contractors, the. CMAR shall, upon <br />recognizing the condition, Immediately stop Work In' the <br />affected area and report the condition to the Owner and the <br />Project property owner If different from the Owner and Project <br />Designer In writing. The Owner or Project property owner if <br />different from the Owner shall . take responsibility for <br />remedlation of the material. or substance from the site. If the <br />CMAR dalm's its progress in completing the Project is delayed <br />because of the remedlation response to the site, the CMAR <br />shall file notice and a claim In accordance with this Agreement <br />3.i0.15.12 Any land-disturbing activity performed by the CMAR <br />In connection with the Project shall comply with all erosion <br />control measures set forth in the Contract Documents and any <br />additional measures which may be required In order to ensure <br />that the Project Is In full compliance with. the Sedimentation <br />Pollution Control Act of 1973, as.. implemented by Title 15, <br />North Carolina Administrative Code, Chapter 4, Sedimentation <br />Control, - Subchapters 4A, 48 and 4C, as amended (15 <br />N.C.A.C. 4A, 4B and 4C). <br />3.11 Post Construction Phase <br />The CMAR shall provide the following ongoing services in <br />connection with Final Completion of the Work by the <br />Contractors: <br />3.11 .1 Record Documents <br />The CMAR shall coordinate and expedite submittals of <br />information from the Contractors for preparation of record <br />Drawings and Specifications, and shall coordinate and expedite <br />the transmittal of such record documents to the Owner. <br />3.11.2 Q=nlze and Index Operations and Maintenance <br />terfa! <br />Prior to final completion of the Project the CMAR shall compile <br />manufacturers' operations and maintenance manuals, <br />warranties and guarantees and bind such documents in an <br />organized manner. This information shall then be provided to <br />the Owner. . <br />3.11.3 Oocuoancv Permit <br />The CMAR shall assist the Owner and Designer In obtaining an <br />occupancy permit by accompanying governmental officials <br />during Inspections of the Project, preparing and submitting <br />documentation to governmental agencies and coordinating final. <br />testing and other activities. <br />3.11.4 Occupancy Plan <br />The! CMA ;4 In consultation with the Owner, the Designer and <br />appropriate regulatory agencies, shall prepare an Occupancy <br />Plan for the Project This plan shall be provided to the Owner <br />at least thirty days prior to Substantial Completion. <br />3.12 Additional Services <br />The CMAR agrees to perform all tasks and functions <br />reasonably necessary to complete the services described in <br />the preceding paragraphs In this Article 3, even 'rf not explicitly <br />described therein, unless the tasks or functions are explicitly <br />described as Additional Services In thls section 3.12.•' At the <br />request of the Owner, the CMAR shall perform Additional <br />Services and shall be compensated for same-as provided in <br />Article 7 of this Agreement The -CMAR shall perform <br />Additional Services only after the Owner and ' CMAR have <br />executed a written amendment to this Agreement providing for <br />such services. The following is a list of. Services that might <br />reasonably be. anticipated, with indication of whether the <br />specified services will be considered to be Additional Services <br />or required Services: <br />3.12.1 Services related to Investigation; appraisal, or evaluation. . <br />of existing conditions, facilities, or equipment or determination <br />of the accuracy of existing drawings or other. :Information _ <br />furnished by the Owner are required and are not Additional <br />Services; <br />3.12.2 Services related to procurement, storage, maintenance <br />and installation of Owner - furnished equipment, materials, <br />supplies and furnishings are Additional Services; provided, <br />however, that coordination and scheduling of the procurement, <br />storage, maintenance and Installation of Owner- fumished <br />equipment, materials, supplies and fumishings with the Work of <br />the Contractors is required and is not an Additional Service; <br />
The URL can be used to link to this page
Your browser does not support the video tag.