Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
change in the Guaranteed Maximum Price that corresponds <br />with any approved construction contract change order. <br />3.10.10 Quality Review and W rranw <br />The CMAR unconditionally warrants and guarantees all <br />materials and workmanship against patent defects arising from <br />faulty materials, faulty workmanship or negligence for a period <br />of twelve (12). months following the date of substantial <br />completion of the Work and shall replace such defective <br />materials or workmanship without cost to the Owner. <br />3.10.10.1 In addition to the foregoing general warranty, the <br />Contract Documents may require extended warranties for <br />specified building components, including without limitation <br />mechanical and electrical equipment, elevators and escalators, <br />security equipment, roof, curtain wall, doors and waterproofing. <br />Extended warranties shall. be specified in the Contract <br />Documents. All such extended warranties shall either be <br />provided by the CMAR or by a Contactor or manufacturer as <br />provided In the Contract Documents. Such warranties shall <br />provide, at a minimum, for the repair or replacement bf <br />defective or non - conforming components within the warranty <br />period <br />3.10.10.2 The CMAR shall establish and .implement a program <br />to monitor the quality of oonstruction. The purpose of the <br />program shall be to guard the Owner. against .defects and <br />deficiency in the work of the Contractors. The CMAR shah <br />transmit to the Designer and the Contractor a notice of <br />nonconforming work and may require that ' the Contractors <br />correct Work at no expense to the Owner when it Is the opinion <br />of the CMAR that the Work does not conform to the <br />requirements of the Contract Documents. Except for minor <br />variations as stated herein, the CMAR Is not authorized as part <br />of this service to change, evoke, enlarge, relax; alter, or to <br />release any requirement of the Contract Documents or to <br />approve or accept any portion of the Work not performed in <br />accordance with the Contract Documents. <br />3.10.11 Tesfina by the CMAR <br />The CMAR shall recommend to the Owner additional tests and <br />inspections that the CMAR believes should be. conducted to <br />monitor the quality of construction and compliance with the <br />Contract Documents. Notice of all such tests.and inspections <br />shag be provided to the Owner and the.Designer, and copies of <br />the results and reports of all-such tests and inspections shall be <br />provided to the Owner and the Designer: ' <br />13 <br />3.10.42 motion and Maintenance Materials . <br />The CMAR shall . obtain frwn the Contractors, review and <br />assemble operation and maintenance manuals, warranties and <br />guarantees for materials and. equipment Installed in the Project, <br />In accordance with the Contract Documents and the Master <br />Schedule. It is expected that all operation and maintenance <br />manuals will be compiled and delivered to the Owner before <br />the Project Is substantially complete, and generally when the <br />Work is eighty percent complete. <br />3.10.13 Substantial Completion <br />Substantial completion is the point In time when the Work, as <br />determined by , the Designer, is sufficiently. " complete in <br />accordance with the Contract Documents that it can be utilized <br />by the Owner for Its Intended use, and all necessary permits <br />and permissions for beneficial occupancy and utilization having . <br />been obtained by the CMAR. All operations and maintenance <br />manuals, Owner training, and as -built drawings must be <br />submitted prior to Final Completion being achieved. <br />The CMAR shall, prior to requesting a Certificate of Substantial <br />Completion, prepare and submit to the Contractors lists <br />Identifying Work that does not conform to the Contract . <br />Documents. The CMAR shall not request a Certificate of <br />Substantial Completion from the Designer until the CMAR <br />believes that the Project is substantially complete and certifies <br />to the Designer. that all of the Work Is substantially complete. <br />The Designer shall then determine whether the Project is <br />substantially complete. Upon Substantial Completion, the <br />Designer shall prepare and submit to the CMAR a deficiency , <br />list identifying all portions of the Work which are known by the <br />Designer at that time to be Incomplete or defective. Within <br />forW -ffve (45) days of receipt of this deficiency list, the CMAR <br />shall complete and correct all items on that list along with all <br />other Work required to achieve Final Completion of the Work. <br />At arty time prior to completion of the period of warranty, the <br />Designer may submit to the CMAR a supplemental deficiency <br />list, in which case the CMAR shall complete or correct any and <br />all new -items identified on the Supplemental deficiency list. <br />3.10.14 Final Completion <br />In consultation with the Designer, the CMAR shall determine <br />when the Project and the ` Contractor's Work are finally <br />completed and, following completion of corrections, shall issue <br />a Certificate of Final Completion to the Owner. Upon delivery <br />of the Certificate of Final Completion to the fawner, the CMAR <br />shalt make all remaining payments due to Contractors.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.