Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
connection with the Project, and (ii) that all payments for materials, services, and for any <br />other reason in connection with the subcontract or supply contract have been satisfied and <br />that no claims or liens exist against the Subcontractor or supplier in connection therewith; <br />and (C) the written consent of the Contractor's sureties to Final Payment_ In the event that <br />the Contractor cannot obtain an affidavit, as required above,_ from any Subcontractor or <br />supplier, the Contractor shall state in the Contractor's affidavit that no claims or liens exist <br />against such Subcontractor or supplier to the best of the Contractor's knowledge, and that if <br />any appear afterwards, the Contractor shall indemnify and save the CMAR and the Owner <br />harmless for all costs and expenses, including attorney's fees, on account thereof. <br />ARTICLE 23. ASSIGNMENTS AND SUBCONTRACTS <br />23.1 The Contractor shall not assign any portion of this Agreement nor subcontract the Work in <br />its entirety without the prior written consent of the CMAR. Except as may be required under <br />terms of the bonds required by the Contract Documents, no funds or sums of money due or <br />to become due to the Contractor under the Contract Documents may be assigned.' <br />ARTICLE 24. MEASUREMENTS <br />24.1 Before ordering material or doing Work which is dependent for proper'size or installation <br />upon coordination with building conditions, .the Contractor -shall verify all dimensions and <br />shall be responsible for the correctness of same. No consideration will - be given for any <br />claim based on differences between the actual dimensions and those indicated in the <br />Contract Documents. Any discrepancies between the Contract Documents and the existing <br />conditions shall be referred to the Designer by the CMAR for-'adjustment before any Work <br />affected thereby is begun. <br />ARTICLE 25. CONTRACTOR AND SUBCONTRACTOR RELATIONSHIPS <br />25.1 Within thirty (30) days after initial receipt of the Construction Agreement by the Contractor <br />for signatures, the Contractor shall'submit to the CMAR for acceptance a current list of the <br />names of Subcontractors and such other persons and organizations (including those who <br />are to furnish materials or equipment fabricated to a special design) proposed for any and <br />all portions of the Work. The Contractor shall provide this list at this . time even if the <br />Contractor was required to submit a list of proposed Subcontractors with the Contractor's <br />bid. The CMAR shall promptly reply to the Contractor in writing stating whether or not the <br />CMAR, after due investigation, has objection to any such proposed person or entdy or if it <br />needs additional information to evaluate the persons or entities on the list. Failure of the <br />CMAR to reply within ten (10) days after the Contractor has. furnished all required <br />information shall constitute notice of no objection. <br />The Contractor shall not contract with any such proposed person ' or entity to which the <br />CMAR has made reasonable objection. If the CMAR has-reasonable objection to any such <br />proposed person or entity, the Contractor'shall submit a substitute to whom the CMAR has <br />no reasonable objection. The Contractor shall make no substitution for any Subcontractor, <br />person, or entity previously allowed without first notifying the CMAR. in writing and . no <br />substitution may be made if the CMAR makes a reasonable objection to such substitution. <br />25.2 The Contractor agrees that the terms of the Contract Documents, including all portions <br />thereof, shall apply to all Subcontractors as if they were the Contractor, . and that the <br />Subcontractors shall, by means of their subcontracts, be bound by all the terms of the <br />Contract Documents. <br />25.3 Payments to Subcontractors by the Contractor shall be made in accordance. with the <br />provisions of N.C. Gen. Stat. §143- 134.1. <br />GENERAL CONDITIONS FORCM AT RISK PROJECT 38 of 42 <br />Jt1NE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.