Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
project funding. The documents shall be prepared in a form <br />approved by the Owner. <br />3.9 Procurement PhasQ <br />All construction contrasts. labor. materials and serviges shalt be <br />procured in accordance with N.C. Gen: Stat 4 143 -128.1 and <br />other sections of Chapter 143 Article 8 of the North Carolina <br />General Statutes relating to construction management at risk <br />contrails. <br />3.9.1 Preaualif ins Bidders <br />The CMAR shall develop lists of possible bidders and shall <br />prequalify bidders. This service shall Include the following: <br />preparation and transmission of questionnadres; receiving and <br />analyzing completed . questionnalres; interviewing possible <br />bidders, bonding agents, - and financial Institutions; and <br />preparing summary reports regarding this activity to the Owner. <br />The CMAR shall also prepare and transmit to the Owner a <br />bidders list for each bid package. The Owner shall notify the. <br />CMAR promptly of any reasonable objections to a proposed <br />bidder, and the CMAR shall remove that bidder from- the <br />bidders list . <br />3.9.2 Bidder's Interest Campaign <br />The CMAR shall conduct a telephonic and correspondence <br />campaign to attempt to create interest among qualified bidders, <br />both to foster competition for the Work of the Project and to <br />satisfy the requirements of the Owners Minority Business <br />Enterprise Policy, attached to this Agreement as Appendix C. <br />3.9.3 Nodes and Advertisements <br />The CMAR shall prepare and place notices and advertisements <br />to solicit competitive bids for the Project. <br />3.9.4 lie ven of Bid Documents <br />The CMAR shall expedite the delivery of bid documents to the <br />bidders. The CMAR shall obtain a full set of documents from <br />the Designer and arrange for printing, binding, -wrapping and <br />delivery to the bidders. The CMAR shall maintain a record of <br />bidders receiving documents. <br />3.9.5 Prf4ld Conference <br />In conjunction with the Designer, the CMAR shall conduct a <br />Pre -Bid Conference. These conferences shall be forums for <br />the CMAR and Designer to explain to the bidders the Project <br />requirements, including information concerning schedule <br />..requirements, time and cost control requirements, access <br />11 <br />requirements,, contractor interfaces, minority and women's <br />business - enterprise goals, the project administrative <br />requirements and technical information. - <br />3.9.6 Information to Bidders <br />The CMAR shall develop' and coordinate procedures to provide <br />answers to bidders' questions. <br />3.9.7 Addenda <br />The CMAR shall receive from 'tire Designer a copy of all <br />addenda. The CMAR shall review addenda for clarity, <br />consistency and coordination. By performing the reviews <br />described herein, the CMAR is not acting In a manner so as to <br />assume responsibility or liability, In whole or In part, for all or <br />any part of the Project design or the .content of the design <br />documents. The' CMAR shall also distribute a copy of all <br />addenda to each bidder receiving documents. <br />3.9.8 Bid Ooenina <br />-The CMAR.shall conduct bid openings 1n accordance with <br />statute. and shall evaluate the bids to determine the lowest <br />responsive and responsible bidder. The CMAR shall not award <br />or enter into any contract for Work on the Project until the <br />CMAR has provided the Owner with written notice of the intent <br />to award the contract with reasons for awarding the contract to <br />the 'successful bidder. - This written notice shall also describe <br />compliance by the bidder with the Owner's Minority Business <br />Enterprise Policy, attached to this Agreement as Appendix <br />C - . The Owner shall be given reasonable opportunity to <br />consider the qualifications of the successful bidder, and the <br />Impact of award of the contract on. the Project and Construction <br />Budget <br />3.9.9 Construction Contracts <br />At the direction.-of the Owner, the CMAR shall . prepare, <br />execute, and deliver the Contract Documents between the <br />CMAR and the Contractors. The CMAR shall also issue the <br />notices to proceed. <br />3.9.10 Permits. Insurance and Labor Affidavits <br />The CMAR shall verify that all required building permits, bonds, <br />Insurance, labor aifldav€ts, and waivers required for the Project <br />have been obtained. <br />3.10 Construction Phase <br />-'The CMAR shall be responsible for construction administration <br />and management overall field supervision, Project safety <br />program, .quality assurance, and other. services needed to <br />
The URL can be used to link to this page
Your browser does not support the video tag.