Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents at no additional cost to the CMAR. Work or property of the Owner or others <br />damaged or destroyed by virtue of such condemned Work shall be made good at the <br />expense of the Contractor. <br />Correction of condemned Work described above shall be commenced by the Contractor <br />within twenty -four (24) hours after notice from the CMAR and shall be pursued to <br />completion. Should the.Contractor fail to proceed reasonably with the above- mentioned <br />corrections, the CMAR may, three (3) days after the notice specified in the preceding <br />sentence, proceed with correction, paying the cost, including costs of uncovering such <br />condemned Work, of such corrections from amounts due or to become due to the <br />Contractor.' <br />Condemned Work removed shall be the property of the Contractor and shall be removed <br />from the Project by the Contractor within ten (10) days after notice to remove it, and if not <br />then removed, thereafter may be disposed of by the CMAR without compensation to the <br />Contractor and the cost of such disposal shall be deducted from amounts due or to become <br />due to the Contractor. <br />Should the cost of correction of the Work and, if applicable, disposal of the condemned <br />Work by the. CMAR exceed the amount due or to 'become due the Contractor, the <br />Contractor and the Contractor's sureties shall be liable for and. shall pay to the CMAR the <br />amount of such excess. <br />ARTICLE 18. CORRECTION OF WORK AFTER SUBSTANTIAL COMPLETION; WARRANTIES AND <br />GUARANTIES <br />18.1 No certificate of completion by any party, Final Payment, occupation of the premises by the <br />Owner, any provision of the Contract Documents, or any other act or instrument of the <br />CMAR, the Owner or the Designer shall relieve the Contractor from responsibility for <br />negligence, defective material or workmanship, or failure to comply fully with the Contract <br />Documents. <br />18.2 The Contractor shall, at the Contractor's sole cost and expense, make all necessary <br />repairs, replacements, -and corrections of any nature or description, interior or exterior, <br />structural or non - structural, that shall become necessary by reason of defective <br />workmanship or materials which appear within a period of one (1) year from the date of <br />Substantial Completion and acceptance of the Project by the Owner; provided, however <br />that notwithstanding the preceding, if any longer guarantee period is specified for any <br />particular materials or workmanship under the Contract Documents, or under any <br />subcontract, or in connection with any manufactured unit which is installed in the Project, or <br />under the laws of the State of North Carolina, the longer guarantee period shall govern. <br />18.3 If, within any guarantee period, repairs or changes are required in connection with the <br />Work, which are rendered necessary as the result of the use of materials, equipment, or <br />workmanship which are inferior; defective, or not in accordance with the terms of the <br />Contract Documents, the Contractor shall, promptly upon receipt of notice from the CMAR <br />and without expense to the CMAR:_ <br />a) Completely repair or replace the Work. so that it conforms to the Contract <br />Documents; _ <br />b) Correct all defects therein; <br />C) Make good all damage which, 1n the opinion of the CMAR or the Designer, Is the. <br />result of the use of materials, -equipment, or -. workmanship which are inferior, <br />defective, or not In accordance with.the terms of the Contract Documents; and. <br />JUNE 2007 EDITION <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 33 c f 42- <br />
The URL can be used to link to this page
Your browser does not support the video tag.