Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
barricades, and properly. light the area. The Contractor shall comply with any directions and <br />public authorities in this respect. <br />7.20 The Contractor shall adhere to the rules, regulations, and interpretations of the North <br />Carolina Department. of Labor's Occupational Safety and - Health Standards 'for the <br />Construction Industry (29 CFR Part 1926 as adopted in 13 NCAC 07F.0201, including 29 - <br />CFR Part 1910 General industry Safety and Health Standards applicable to construction) <br />and N.C: Gen. Stat. §95 -126 through 155 (Occupational Safety and Health) as well as all <br />revisions and amendments to such standards or statutes as may occur throughout the <br />performance of the Work. <br />7.21 Any land- disturbing activity performed by the Contractor in connection with the Project shall <br />comply with all erosion control measures set forth in the Contract Documents and any <br />additional measures which may be required in order to ensure that the Project is in full <br />compliance with the Sedimentation Pollution Control Act of 1973, as implemented by Title <br />15 North Carolina Administrative Code, Chapter 4, Sedimentation Control, Subchapters 4A, <br />4B and 4C, as amended (15 NCAC 4A, 4B, and 4C), and as may be revised or amended in <br />the future. Upon receipt of notice that a land - disturbing activity Is in violation of said Act, the . <br />Contractor shall be responsible for ensuring that all steps or actions necessary to bring the <br />Project in compliance with said Act are promptly taken. The Contractor shall be responsible <br />for all penalties assessed pursuant to N.C. Gen. Stat. 113A -64 with respect to its Work, and <br />shall, indemnify and hold harmless the CMAR and the Owner from all costs and expenses, <br />including attorney's fees and costs of defense, arising out of or related to the enforcement <br />of the Act against any party or person described in this Article.. <br />7.22 The Contractor shall designate a responsible officer or employee.as -safety inspector, - <br />whose duties shall include accident prevention on the Project as well as implementation of <br />the Contractor's safety measures and safety programs on the Project., The name of the <br />safety inspector shall be made known to the CMAR at the pre - construction conference. <br />7.23 In emergencies affecting the safety of persons, the Work, or property. at the Project site or <br />adjacent thereto, the Contractor is obligated to act in the Contractor's discretion to prevent <br />threatened damage, injury, or loss. As soon as practicable, the Contractor shall notify the' <br />CMAR of such emergency. The Contractor shall give the CMAR prompt written notice of <br />any significant changes in the Work or deviations from the Contract Documents caused by <br />such emergency. If the Contractor believes that additional work done in an emergency <br />entitles the Contractor to an increase in the Contract Price or an extension of the Contract <br />Time, the Contractor may make a claim therefore as provided in Articles 14 and/or .15 of <br />these General Conditions. <br />7.24 The Contractor shall at all times keep the premises free from accumulation of waste <br />materials or rubbish caused by the Work. At least weekly and at the completion of 'the . <br />Work, the Contractor shall remove all waste materials and rubbish'. attributable to the <br />Contractor's Work from and about the Project. At the completion. of the Work, the <br />Contractor shall remove. all tools, construction . equipment, machinery, and surplus <br />materials. The Contractor shall leave the Work In condition for occupancy.by the Owner <br />such that no cleaning or other operations are required. Material cleared from the Project. <br />and deposited on adjacent property shall not be considered as having been disposed of <br />satisfactorily. If the Contractor fails to keep the Project clean and free of waste materials or . <br />rubbish, fails to satisfactorily clean -up weekly or at the completion of the Work, the CMAR <br />may do so and the costs thereof may be deducted from any amounts due or to become <br />due the Contractor. <br />7.25 Mites, temporary facilities, and signs shall be provided as described in the, dontract <br />Documents... Absent a contrary direction in the Supplementary Conditions, the.Contractor <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 22 of 42 'JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.