Browse
Search
Agenda -11-06-2008 - 4p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 10:42:51 AM
Creation date
11/4/2008 2:37:35 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4p
Document Relationships
2008-101 S Purchasing - Construction Manager at Risk Services for Hillsborough Commons
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
2008-102 Purchasing - Construction Manager at Risk Services for Hillsborough Commons (2)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2008
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
designated to remain in the vicinity of the operations and barricade all walks, roads, and <br />areas as necessary to keep the public away from the construction-. ' <br />7.17 The Contractor shall provide cover and /or protect all portions of the Work and provide all <br />materials necessary to protect the Work whether performed by the Contractor -or any of the <br />Subcontractors or sub - subcontractors. Any. Work damaged through the lack of proper <br />protection, or from any other cause, shall be repaired or replaced without extra cost to the <br />CMAR or extension to the Contract Time. <br />The Contractor shall maintain the Work during construction and until the Work is accepted. <br />This maintenance shall constitute continuous and effective effort prosecuted day by day, <br />with adequate. equipment and forces so that the Work is maintained in satisfactory <br />condition at all times. All costs of maintenance shall be included in the Contract Price and <br />the Contractor will not be paid an additional amount for such effort. Should the CMAR <br />observe that the Contractor at any time has failed to maintain the Work as provided herein, <br />the CMAR may immediately notify the Contractor of such non-compliance. Such notification <br />shall specify a reasonable time within which the Contractor shall be required to remedy <br />such unsatisfactory maintenance condition. Should the Contractor fail to properly respond <br />to the CMAR's notification, 'the CMAR may, at the Contractor's expense, take such action <br />as it may deem appropriate to remedy the defective maintenance, including suspension of <br />the Contractor's Work or any part thereof. Any such expense incurred by the CMAR shall <br />be deducted from monies due or to become due the Contractor. <br />Parking lots, streets, and walks connecting to the Project area shall at all times be <br />protected by the.Contractor from deposits of mud, sand, stone, litter, or debris in anyform. <br />Pedestrian traffic areas around the construction limits must be maintained in a clean and <br />safe condition at all times with required barricades and covered walkways. When <br />excavation or other operations outside the Project limits is required, the C_ ontractor shall, <br />immediately following that work, return the area to its original condition.:. <br />All catch basins and storm drain lines in the vicinity of the Project site shall be protected at <br />all times from entry of dirt, rubble and other debris. The residue from the cleaning of trucks, <br />wheelbarrows, concrete buggies, etc. must be prevented from entering - the drainage <br />system, and if cleaning is done, the residue must be contained and removed from the <br />Project site'with other refuse. <br />7.18 No burning. of refuse or debris shall be allowed inside or around the Project during the <br />course of construction. <br />7,19 The Contractor .shall -provide for and maintain necessary safety measures and safety <br />programs for the protection of its employees and other persons at the Project site, and shall <br />comply at all times with the requirements of the most current edition of the CAGC Safety <br />and Health. Manual for the AGC Accident Prevention Manual in Construction], or the <br />equivalent requirements of the Contractor's safety program, and shall fully comply with all <br />Federal, State, and local laws, rules, regulations, and building code requirements so as to <br />prevent accidents or injuries to persons on or about the Project site. The Contractor shall <br />clearly mark or post signs warning of existing hazards, and shall barricade excavations, <br />elevator shafts, stairways, floor and wall openings and similar hazards. The Contractor <br />shall protect against damage or injury resulting from falling materials, and shall maintain all <br />protective devices and signs throughout the progress of the Work. - <br />-All trenches, excavations, or other hazards in the vicinity of the Work -shall be well _ <br />barricaded,:and properly lighted at night. When Work requires dosing of an area normally <br />used by" Owner or the public, the Contractor shall furnish; erect, and maintain temporary <br />GENERAL CONDITIONS FOR CM AT RISK. PROJECT 21 of 42 JUNE 2007 EDITION <br />
The URL can be used to link to this page
Your browser does not support the video tag.