Orange County NC Website
Name: Addie Wilson Page 2 of 15 <br />Address: 104 Starlite Drive <br />City: Carrboro ~~ <br />Date: 9/9/08 <br />I. MAJOR SYSTEMS <br />A. SUB-AREA & TERMITE TREATMENT <br />1. Chemically treat entire perimeter of house for termite and pest control. Chemical <br />treatment to be done by a licensed termite or pest control company. Contractor to <br />provide owner with written proof and warranty of treatment. <br />2. Remove debris from all crawlspace areas including remaining existing plastic moisture <br />barrier. Supply and insta116 mil plastic vapor barrier to all crawlspace areas to provide <br />moisture protection. <br />3. Install temporary support below Den floor and remove existing screw jack. Prepare <br />area for installation of new concrete footing and concrete block curtain wall with new <br />wood access panel. Supply and install new 15"W X 6"H concrete footing and 8"W X <br />8"H X 16"L concrete block curtain wall, approximately 5'W X 5'H, securely anchored <br />to adjacent curtain wall. New curtain wall to have pressure treated wood sill plate <br />secured to curtain wall and existing framing, and opening to accommodate <br />approximately 2'W X 3'H new wood access panel. Supply and install new <br />approximately 2'W X 3'H pressure treated wood access panel, securely anchored into <br />curtain wall, with 2X framing, 3/a" plywood facing with 2X cross bracing, 1X door <br />stops, all necessary hardware and lock, complete. Includes gray shear wall parge coat <br />on exterior of new curtain wall with smooth finish to match existing as close as is <br />practical. <br />4. Prepare existing opening in left exterior wall below Master Bedroom for installation of <br />new wood access panel. Supply and install new pressure treated wood access panel, <br />approximately 3' W X 4' 6"H, securely anchored with anchor screws into existing <br />opening in curtain wall, with 2X framing, 3/a" plywood facing with 2X cross bracing, <br />1X door stops, all necessary hardware and lock, complete. <br />5. Repair existing floor framing and walls below Master Bedroom, Den and Storage <br />Room to accommodate installation of new foundation vents. Supply and install one <br />new foundation vent in left side wall below Master Bedroom. Supply and install <br />blocking below Master Bedroom with pressure treated wood to enclose gap between <br />top of rear curtain wall and framing above. Supply and install two (2) new foundation <br />vents in rear wall below Den and Storage Room. Repair two (2) existing foundation <br />vents in rear foundation wall below main portion of house to restore to proper working <br />order. <br />