Browse
Search
Agenda -11-06-2008 - 4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 2:21:44 PM
Creation date
11/4/2008 2:21:40 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aq <br />Name: Redell McClinton Page 9 <br />Address: 521 Spruce St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 643-3055 <br />Date: August 13, 2008 <br />BATHROOM: <br />8. Install one thirty six inch grab bar and one twenty four inch grab <br />bar in the tub/shower. Grab bars to be screwed into solid blocking. <br />Grab bars to be 1 %Z" stainless steel. <br />9. Install a new recessed medicine cabinet. Owner to approve finish <br />(white or oak finish). <br />CEILINGS: (Kitchen, Living Room, Hall & Bedrooms) <br />Remove all loose peeling paint on ceilings. Scrape as necessary <br />to remove loose paint. Prime ceiling with an oil bonding primer. <br />Spray a textured ceiling (blown ceiling) in the kitchen, living room, <br />hall and bedrooms. Contractor to cover any items in rooms with <br />plastic before spraying ceiling. NOTE: Price to include all necessary <br />sheetrock filler to prepare ceilings for sprayed texture. <br />WALLS: <br />1. Prepare the walls in the kitchen and living room for paint. Repair all <br />damaged areas with sheetrock filler. Caulk all cracks with latex caulk. <br />Prime the walls with an oil bonding primer. Paint the walls with semi- <br />gloss.latex paint. All paint to cover completely. <br />BEDROOM FLOORS: <br />Prepare all bedrooms for a new vinyl floor. Remove all shoe molding. <br />Install '/4" lauan plywood in all bedrooms. Trim bottom casing as <br />necessary to install plywood. Install a new vinyl floor in the bedrooms. <br />The vinyl to cost not less than. $ 18.00 sq. yard. Note: Lauan and vinyl <br />to extend into all closets. Install metal trim at all bedroom entrance doors. <br />Install matching shoe molding in all bedrooms. Properly nail new <br />shoe molding. <br />RIGHT REAR BEDROOM: <br />1. Install a new 1 3/8" interior door to match. Install new hinges and <br />privacy lockset. Door to open, close and lock properly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.