Browse
Search
Agenda -11-06-2008 - 4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 2:21:44 PM
Creation date
11/4/2008 2:21:40 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Redell McClinton Page 5 <br />Address: 521 Spruce St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 643-3055 <br />Date: August 13, 2008 <br />ELECTRICAL: <br />6. Install a GFI circuit and receptacle in the bathroom. <br />7. Install a new vanity light fixture above the medicine cabinet. <br />The fixture allowance is $ 35.00. Owner to approve style and <br />fmish. Make all electrical connections. <br />8. Install new ceiling light fixtures in all bedrooms. Fixture allowance <br />is $35.00 per fixture. Make all electrical connections. <br />MECHANICAL: <br />Install a split system heat pump HVAC system. Mechanical <br />Contractor to size the unit in accordance with ASNR AR/Manual <br />"J" specifications and ductwork design to be in accordance with <br />ASHRAE/Manual "D" specifications. New heat/air system to be a <br />complete operational system. All ductwork to be insulated. Both <br />electrical and mechanical permits are required and all work to pass <br />current codes. Contractor to provide paperwork meeting the above <br />requirements. Price to include all registers and digital thermostat. <br />2. Remove all existing baseboard heaters and wall-mounted thermostats. <br />Replace double-pole breakers (240 volt) with single pole breakers <br />for the (120 volt) circuits. Install receptacles in all locations where <br />baseboard heater were removed. At all wall mounted thermostats <br />electrician to thru-wire and install blank cover. <br />3. Install new matching wood baseboard in all locations where the <br />Electric baseboard heaters were removed. Note: New trim to match <br />existing trim. All joints to be 45 degree and nailed to a wall stud. <br />Note: If wood trim is stained solid trim to be installed. <br />INSULATION: <br />Remove the insulation in the crawlspace. Supply and install R-19 <br />batt insulation in the crawlspace to code. <br />NOTE: Floor system to be treated for power post beetles before <br />insulation is installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.