Browse
Search
Agenda -11-06-2008 - 4n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 11-06-2008
>
Agenda -11-06-2008 - 4n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 2:21:44 PM
Creation date
11/4/2008 2:21:40 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4n
Document Relationships
Minutes - 20081106
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Redell McClinton <br />Address: 521 Spruce St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 643-3055 <br />Date: August 13, 2008 <br />3. Install a new crawlspace door and frame. Install a 2x8 pressure <br />treated frame and 3/4 pressure treated door. Install 3/a" x 2" door- <br />. stop, galvanized hinges and locking hasp. Note: Cut door square <br />and to fit opening. Door to close and latch properly. <br />4. Install automatic foundation vents. New vents to be secure in <br />opening and installed properly. <br />Page 2 <br />Install pressure treated guardrails and handrails on the front porch. <br />Install 4x4 posts, 2x4 handrail and 2x2 pickets. Install railings to <br />code. All nails to be hot dipped galvanized. Insta114x4 posts beside <br />porch into ground. <br />6. Remove the damaged brick veneer on the front left corner. Area <br />approximately 3' x 4'. New brick to match as close as possible. <br />Strike joints to match. Note: An experienced mason to perform <br />this work. <br />WINDOWS: <br />Replace all existing windows with vinyl replacement windows. <br />Note: Install new replacement windows from the exterior. Remove <br />window stop as necessary to install window. Contractor to verify <br />all sizes and measurements. New replacement windows to open, <br />close and lock properly. NOTE: Replacement windows to be double <br />hung and complete with screen and locks. <br />2. Wrap all window and door frames with white aluminum coil <br />stock. Note: Aluminum to be properly installed. All corners and <br />joints to be water tight. Apply 100% silicone caulk where aluminum <br />meets the brick. <br />DOORS: <br />Install a 36" 9 lite exterior door unit in the kitchen. Properly install <br />door unit squarely in opening. Note: Door to open, close and lock <br />Properly. Install a keyed locked and deadbolt to be keyed alike. <br />Install matching casing on the interior. Prime with oil primer. <br />Note: Raise new door unit so bottom of threshold is even with <br />concrete porch. Install pressure treated lumber and caulk threshold. <br />
The URL can be used to link to this page
Your browser does not support the video tag.