Orange County NC Website
5 <br /> The Planning Staff finds that there is a perporu3erence of evidence to <br /> indicate SU�ta�ltial coupliance with the General Standards and SpeC1f1C <br /> rules <br /> 9overningll;the request by Buck hbtmtain Development Co. for a Class <br /> A 5121—al Use Permit under Section 8.8.8 of the orange County zoning Ord- <br /> inance. The Planning Staff rends approval of the Special Use Permit <br /> with the following imposed condition: <br /> 1. . That the final site plan and narrative of the project <br /> incorporating all changes, deletions and additions <br /> throu94 the final approval of the project are in- <br /> corporated herein and made a part of the Special Use <br /> Permit; That a copy of the final site plan aril narrative <br /> be on file with the Orange county Planning Department. All <br /> 9.mprovements as indicated on the site plan or stated in the <br /> narrative sha11 be constructed according to the construction <br /> schedule, set up on the final site plan. <br /> 2. That ttie grantee of this Special Use Permit shall post with <br /> Orange County, in a form acceptable to the county Attorney, <br /> a bond[or letter of credit in an amount equal to the cost <br /> Of all Public its plus 10%. The amount shall be <br /> determined on the basis of fully executed construction contracts <br /> or cez ification by a registered engineer erployed by the <br /> grantee of this special Use Permit. Security for construction <br /> of the improvements in this project may follow the phasing in <br /> the Project. specifically, as inprovements are completed in <br /> Bch Phase, that phase and a corresponding amount of money may <br /> be released from the security inst=rents or the security ins- <br /> trumrnts may be renegotiated based on the unconstructed portion <br /> of the iiR=n'0nents. <br /> 3.. That security shall be provided for the grading, clearing, <br /> paving stabilization of all areas in public streets and <br /> the erection of street signs. <br /> 4. That all necessary easements to permit utility (electricity, <br /> telephone, sewer and water) installation, servicing and hookups <br /> to the developamt shall be provided at no cost to the utility <br /> provider. <br /> 5. All plans for drainage, soil erosion and sedirent..ati.on control <br /> shall be rear eked and approve;4 by or?;ge County. In addition, <br /> Orange County shall inspect the inst-ilation of control devices and <br /> the cn going work for the total project. T.he project Shall at <br /> all tires meet the re= rements of the orange C unty Soil Erosion <br /> and Sedimeataticn Control Or'..in,ance. <br /> 6. T7i2t dense evergreen screeninc be provided =or any bui.ldIngs that <br /> are notlat least 500' from the property line. This screen *acerial <br /> shall be of sufficient size to provide a 6' :sedge withir. 3 yeas-s of <br /> planting. Also acceptable as a screening material is a 6' burn <br /> or solid wood fence. <br /> I <br /> I <br /> I <br /> I <br />