Browse
Search
Agenda - 09-30-1999 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 09-30-1999
>
Agenda - 09-30-1999 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 10:57:20 AM
Creation date
10/23/2008 12:19:11 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 19990930
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Margaret Hauth, September 1, 1999, Page 4 33 <br />Kimley -Horn <br />and Associates, Inc. <br />Table 2 <br />Existing (1999) Level -of- Service Summary <br />AM Peak <br />PM Peak <br />Intersection <br />LOS (Delay) <br />LOS (Delay) <br />Old NC 86 / I -40 Eastbound Ramps* <br />Short Delays for <br />Short Delays for <br />Left Turns <br />Left Turns <br />Old NC 86 /1-40 Westbound Ramps* <br />Short Delays for <br />Short Delays for <br />Left Turns <br />Left Turns <br />Old NC 86 / I -85 Northbound Ramps' <br />Long Delays for <br />Long Delays for <br />Left Turns <br />I Left Turns <br />Old NC 86 / I -85 Southbound Ramps' <br />Short Delays for <br />Long Delays for <br />Left Turns <br />Left Turns <br />Old NC 86 / Oakdale Drive <br />C (17.1) <br />B (10.4), <br />Old NC 86 /Cardinal Drive <br />B (7.0) <br />B (5.2) <br />- unsignaiizea <br />The existing traffic volumes were then increased to reflect historical growth due <br />to usage and non - specific growth throughout the area. The 1999 base year traffic <br />volumes were increased by 3.0 percent per year for six years to reflect the 2005 <br />anticipated background traffic volumes. <br />To obtain total 2005 build -out traffic volumes the development traffic was added <br />to the existing and background traffic volumes. The AM and PM peak -hour <br />turning movements for the studied intersections were then calculated and <br />analyzed for the 2005 build -out year. Figures 2 and 3 show the projected AM <br />and PM peak -hour traffic volumes respectively with the proposed site for the <br />year 2005. <br />Roadway Improvements <br />The following roadway improvements were identified to bring the roadway <br />network up to an acceptable Level -of- Service. <br />• Old NC 86 will need to be widened to a four -lane section with turn lanes <br />from I -40 to I -85. This improvement is consistent with the current <br />thoroughfare plan. <br />• The interchange of I -40 and Old NC 86 will require ramp widening, <br />signalization and turn lane additions. <br />• The interchange of I -85 and Old NC 86 will also require ramp widening, <br />signalization and turn lane additions. <br />Figure 4 shows the roadway improvements that will be needed to accommodate <br />the year 2005 total traffic volumes while Table 3 summarizes the Level -of- <br />Service at each of the studied intersections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.