Browse
Search
Agenda - 10-05-1999 - 9h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-05-1999
>
Agenda - 10-05-1999 - 9h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2008 11:08:34 AM
Creation date
10/23/2008 11:08:32 AM
Metadata
Fields
Template:
BOCC
Date
10/5/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9h
Document Relationships
Minutes - 19991005
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10f05f1999 04:08 9196443002 OR. CTY. PLANNING PAGE 07f14 <br />CO~BIN DOWNS <br />(continued) <br />Ra The active park location should be relocated to provide for community <br />access, amelioration from sports lighting on residential properkies, and <br />shared working opportunities. <br />R3 An established standard of active parks and recreation acreage per 1004 <br />population is 5 acres. Therefore, approximately 10 acres should be <br />dedicated. <br />5. ERASION CONTROL - (DIRECT COUNTY SERVICE) <br />R1 The Plazuiing and Inspections Department, Erosion Control Division is <br />responsible for permitting and inspections. A project of this scale -and use <br />should develop a high itatensity erosion control program including full use <br />of phasing and BMP's. <br />ZZ,2 Additional persoztnel may be necessary. <br />R3 A phasing prograzaa should be developed to decrease the total- amount of <br />unvegetated areas at any one time. <br />6. PUBLIC ~'~:A-NSIT' - (DIRECT COUNTX SERVICE) <br />Ri The QPT would be impacted for the variety of uses that are anticipated; <br />senior citizens, apartment housing, hotel, industry, offices, retail <br />destinations, and the suggested development of a pazk and ride lot. <br />7. LANDFILL - (LOG IJIItECT SERVICES) <br />R~ The construction phase would include a high amount of Construction and <br />Demolition t~-aterial with later ongoing garbage generation and recycling <br />needs. Recycling Center area to be added to the site. <br />$. PHASING OF PROTECT <br />12.1 The sequence o!f construction, buildzng use type and infrastructure is <br />critical to the cost(benefit of the entire proposal. <br />g:lcraig\cd-txan~s~ I Oy4-99\dg <br />
The URL can be used to link to this page
Your browser does not support the video tag.