Orange County NC Website
seoK 7 r,~E 2~7 <br />Chairman Smith advised Mr. Hawkins that it would be difficult to access or <br />to establish a firm price quotation because the $oard had no way of being aware of a <br />precise location of any proposed industries and that the total investment, of Orange <br />County, must be considered before any figures were agreed upon. <br /> <br />Chairman Smith read a letter received from James Wallace relative to the fees <br />charged at Lake Orange. Mr. Wallace requested that the County proceed to <br />guarantee citizens access to Lake Orange at a reasonable prescribed fee. <br />Commissioner Ward and Commissioner Walker, stated that they felt the County <br />needed the water when the Lake was developed and that the County had obtained <br />the water at a reasonable cost to the public. Further discussion ensued. <br />There being no further business to come before the Board, the meeting was ' <br />adjourned to meet again on Tuesday, June 9, 1970, at 8 o'clock P.M. <br />Carl M. Smith, Chairman <br />S. M. Gatti s, Actiin~,,.Clerk <br />MINUTES OF THE ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />The Board of Commissioners of Orange County met in adjourned session at the <br />Courthouse in Hillsborough, North Carolina, in the Commissioners Room at 8 o'clock <br />P.M, on Tuesday, June 9, 1970. <br />Members Present: Chairman Carl M. Smith, and Commissioners Harvey b. Sennett, <br />Ira A. Ward, Henry 5. Walker and William C. Ray. <br />Members Absent: None <br />• This meeting was held for the purpose of discussing the proposed 1970-71 <br />budget. Quentin Patterson, County Soil Conservationist, introduced Lacy Coats, <br />Water Shed Planning Economists. Mr. Coats reviewed the findings obtained in the <br />preliminary study of the proposed Seven Mile Creek reservior. He stated that the ~' <br />engineering and geologic point of view for the proposed site was satisfactpry and ' <br />that it would be reasonable to construct an earth dam of approximately 84 feet in <br />height. He stated further that his design would impound water at an average elevation <br />of 600.7 feet above sea level, that a sediment aterage pool of 67.4 acre feet, j <br />7,056 acre feet for municipal water storage and 2,899 feet for flood water storage ~ <br />could be maintained in the proposed structure. This lake would contain about <br />400 surface acres and have a total lake capacity of 10,500 acres. With the emergency I <br />spillway elevation set at 590.3 feet, the normal water line would fluctuate about <br />nine feet. <br />Mr. Coats sited that the average land cost of 5500 per acre was Ysed.to determine <br />the following: Construction Cost-5795,000.00; Land value at 5500.00 per acre- <br />5300,000.00. <br />He further stated that the _ Piedmont Research and Conservation Agency <br />might participate in the funding of the proposed project. The Following estimates <br />were given: A&E Contract-511,000.00 Construction Inspection-571,500.00; Constru- <br />tipn-5135,000.00; making a total of 5217,500.00.. <br />L. David Dixon of the Soil Conservation Service stated that he was of the <br />opinion that work on the planned soil map would be under way after July 1, 1970. <br />Lloyd Osterman, Regional Librarian, presented the Regional Library's budget. <br />Said budget totaled 520,630.000 and represented an increase of 52,670.00 over the <br />1969--70 budget request. Mr. Osterman stated that 51,900 of the monies was <br />ear-marked for renovation of the upstairs area of the library and that the additional <br />monies would allow for a 10% salary increase for the library personnel. <br />Mr. Osterman presented for the approval of the $oard an agreement for death <br />benefits under the North Carolina Local Government Employees' Retirement System. <br />Upon motion of Commissioner Sennett, seconded by Commissioner Walker, it was 1 <br />moved and adopted that the following agreement be properly executed. <br />AGREEMENT-DEATH BENEFIT ` <br />General Employees I <br />In accordance with the provisions of subsection (1) of G.S. <br />128--27 setting forth the conditions under which the rights to <br />the death benefit might be made available to members of the North <br />Carolina Local Governmental Employees' Retirement System, this <br />AGREEMENT is hereby entered into between the County Commissioners <br />of Orange County and the Director of said Retirement System. <br />In consideratipn of an increase pf .33% in the employer's <br />contribution rate effective as of July 1, 1970, the North Carolina <br />