Browse
Search
Agenda - 10-13-1999 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-13-1999
>
Agenda - 10-13-1999 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2008 4:15:28 PM
Creation date
10/21/2008 4:15:20 PM
Metadata
Fields
Template:
BOCC
Date
10/13/1999
Meeting Type
Work Session
Agenda Item
2
Document Relationships
Minutes - 19991013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
ORD-1999-012 Ordinance Amending Subdivision Reguulations Section II and Section IV-B10
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1999
ORD-1999-013 Ordinance Amending Article 22 Flexible Development and Open Space Definitions
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"open space" in a flexible development subdivision. <br />2 <br />Proposed: Proposed amendments: • correct inadequacies of the conservation option to <br />provide subdivisions with intended features of flexible development; • clarify other flexible <br />development provisions including estate lot provisions; and address inadequacies of the <br />conservation option that are common. for other flexible development approaches. An attached <br />document giving existing ordinance language and proposed amendments contains staff annotation <br />for each proposed amendment. <br />In summary, proposed amendments to Orange County Subdivision Regulations,, Section II <br />Definitions, Section IV-B-10 Flexible Development. and to Orange County Zoning Ordinance, <br />Article 22 Definitions: <br />• A. Delete undesirable elements of the conservation approach and combine the desirable <br />elements of that approach with the cluster approach to create the conservation-cluster <br />(cc) approach; <br />• B. Clarify that any transfer of density within a cluster development may not increase <br />density allowed by the zoning ordinance within protected watersheds. and their critical <br />areas <br />• C. Clarify and define configuration and placement of open space (i.e. contiguous- <br />stretches) <br />• D. Add provision fora 100'( cc approach) or 150'( estate approach) buffer along adjacent <br />public roads to enhance preservation of rural character; <br />• E. Modify setbacks and percentage of open space allowed for .placement of septic systems <br />(25% allowed for repair area); <br />• F. Reduce minimum lot size of estate lots from 4.0 acres to 3.0 acres with average lot <br />.size of 3.5 acres; <br />• G. Provide for Internal access for all lots in the estate approach; and <br />• H. Add a definition to the Article II of the zoning ordinance for "Open space (flexible <br />development)". <br />Development Process. Schedule. and Action <br />• Public Hearing May 24, 1999: Major comments were that flexible development would not be <br />- used if those options did not offer some incentive to the developer Draft minutes are attached. <br />• Public Hearing August 23, 1999: Additional amendments addressing comments from the <br />May 24, 1999, Public Hearing were brought back for public comment. <br />• First Action: Planning Board Recommendation: <br />Planning Board reviewed the amendments July 13, 1999, including the proposed amendments <br />presented at the August 23, 1999, Public Hearing. Minutes are attached. <br />• Final Action: Board of Commissioners to consider amendments to the Orange County <br />Zoning Ordinance. <br />FINANCIAL IMPACT: Not Applicable. <br />~.\L.._.y _.. J\d...J _.~___L_ J..\O AO 8/111.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.