Browse
Search
Agenda - 10-19-1999 - 9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-19-1999
>
Agenda - 10-19-1999 - 9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 11:17:31 AM
Creation date
10/21/2008 2:34:06 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 19991019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
ORD-1999-015 Text Amendments Development Standards in Cane Creek Watershed
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 1990-1999\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j� <br />I <br />2 <br />Development Process, Schedule, and Action <br />• Public hearing held on November 23,.1998 (minutes are attached beginning on page 27). <br />® First Action: Planning Board, on September 1, 1999, voted four (4) to two (2) .to approve the <br />proposed amendments to decrease the maximum density in the watershed and not to approve. <br />the amendments allowing flexible development within the watershed (at an overall density of <br />1du /2 acres with 50% open space). Minutes of the September 1, 1999, Planning "Board meeting are <br />attached (beginning on page 34). The attached August 26, 1999, memorandum to . the Planning <br />Board (pages 43 - 45) gives additional information for which the Planning Board had asked for in an <br />earlier meeting: <br />® Final Action: Board of County Commissioners to consider proposed amendments.." <br />New evidence which was not presented in writing to the Planning Board may not be considered by the <br />Board of Commissioners in making a decision unless the joint public hearing is reopened to receive <br />said evidence, and the .item is readvertised and /or referred back to the . Planning Board for <br />recommendation. <br />FINANCIAL IMPACT: Not applicable: <br />RECOMMENDATION(S): <br />Planning Board Recommendation: eApprove density of 1 dwelling unit per five acres with lots of <br />record allowed not more than five lots as small as two (2) acres. <br />eDo not approve Flexible Development allowing an overall <br />density of 1 du /2 ac. <br />Administration Recommendation: <br />Approve amendments per the attached Administration <br />Recommendation beginning on page 3. (Proposed amendments to <br />the Orange County Zoning Ordinance begin on page 5; proposed <br />amendments to the Orange County Subdivision Regulations begin on <br />page 12.) <br />® Maximum density: 2/6 OPTION: 1 du / five acres; Lots of record existing on date of adoption may <br />contain up to, but no more than, five lots as small as two acres in size. <br />AND <br />FLEX OPTION: Overall density of 1 du / 3 acres (minimum lot size of 1.5 <br />acres) allowed in subdivisions developed .using flexible development <br />provisions provided 50% of total area is reserved as open space. <br />® 50% open space requirement in flexible development subdivisions within the Cane Creek <br />watershed. <br />An Ordinance Amending the Orange County Zoning Ordinance is attached on pages 16 -23. An Ordinance. <br />Amending the Orange County Subdivision Regulations is attached on pages 24 -26. <br />g:\ bctamend \canecrk%occabs.doc \10 -6 -99W <br />
The URL can be used to link to this page
Your browser does not support the video tag.