Browse
Search
Agenda - 10-19-1999 - 9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 10-19-1999
>
Agenda - 10-19-1999 - 9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2008 2:21:15 PM
Creation date
10/21/2008 2:19:58 PM
Metadata
Fields
Template:
BOCC
Date
10/19/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 19991019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 5 <br />PROGRESS PAYMENTS <br />5.1 Based upon Apptications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the <br />Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and <br />elsewhere in the Contract Documents. <br />5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as <br />follows: <br />5.3 Provided an Application for Payment is received by the Architect not later than the 2nd day of the month and approved <br />by the owner not 1 ater than the lOthday of a month, the Owner shall make payment to the Contractor not later than <br />the 30th day of the same month. If an Application for Payment is received by the <br />Architect after the application date fixed above, payment shall be made by the Owner not later than the 30th day of the <br />following month darts after the Architect receives the Application for Payment. <br />5.4 Each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with <br />the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work <br />and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require: This schedule, <br />unless objected to by the Architect,. shall be used as a basis for reviewing the Contractor's Applications for Payment. <br />5.5 Applications for Payment shall indicate the percentage of completion of each portion of.the Work as of the end of the period <br />covered by the Application for Payment. <br />5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: <br />5.6.1. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage <br />completion of each portion of the Work by the share of tine total Contract Sum allocated w that portion of the Work in the schedule <br />of values, less retainage of ten percent <br />( 10 %). Pending fuial determination of cost to the Owner of changes in the Work, amounts not in the dispute maybe <br />included as provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted <br />by Change Order; <br />5.6.2 Add that portion of the Contract Stun properly'allocable to materials and equipment delivered and suitably stored at the <br />site for subsequent incorporation In the completed construction (or, if approved in advance by the Owner; suitably stored off the . <br />site at a location agreed upon in writing), less retainage of ten <br />percent ( 10 %); <br />5.6.3 Subtract the. aggregate of previous payments made by the Owner; and <br />5.6.4 Subtract amotmts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Para- <br />graph 9.5 of the General Conditions. <br />5.T The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following <br />circumstances: As allowed by the contract doc~mlettts <br />5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to <br />Ninety percent ( 90 ~ %) of the Contract <br />Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and <br />5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional <br />amounts payable in accordance with Subparagraph 9.10.3 of the General Conditions. <br />5.8 Reduction or limitation of retainage, If any, shall be as follows: <br />(/j Jt is irrterrded, prior to Substantlat CompleJlun of the entire Work, to reduce or /!coil the retainage resulting jrom the perrxntages Inserted In Subpara- <br />graphs 5. ti. t acrd S. (i.2 above, and Ibis is xut explaixed elsembere lx the Contract Documents, Insert here provlstons jor such reduction or /imttatlon.) <br />As noted herein. <br />AU DOCUMENT A101 •OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • AUK • ®1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 A101-1987 4 <br />WARNINf:• I /nll~rnarkl nhntrx~nnvlnn vinlMwi< I I R rnrwAnht Ir•wa r•ntl Iw wrrhlwM to {wnnl nm+uM+~tMn <br />